Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Tremayne Whitfield Design Technician a. TOTAL 15 b. WITH CURRENT FIRM 11 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Johnson Engineering, Port Charlotte, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S. – Computer Visualization Technology <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Piper Road Improvements <br />Charlotte County, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />a. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The Piper Road project includes a corridor study and subsequent design for 3.51 miles of new four-lane urban <br />arterial roadway to serve the Charlotte County Municipal Airport and surrounding properties. Teradyne is a design <br />technician responsible for roadway and drainage plan production. <br /> <br /> <br /> <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Aqui Esta Drive Improvements <br />Punta Gorda, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />b. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Tremayne was the lead technician responsible for roadway and drainage production. The Aqui Esta Drive project is <br />approximately 1.831 miles and will modify the two-lane roadway. <br /> <br /> <br /> <br /> <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Six Mile Cypress Parkway Widening <br />Lee County, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (If applicable) <br /> <br />c. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design of an urban corridor project which will complete the widening of Six Mile Cypress Parkway from its original <br />two-lane configuration to an ultimate six-lane urban arterial. Construction cost approximately $18 million. Tremayne <br />was a production technician on this project. <br /> <br /> <br /> <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Yates Road / Ewell Road Intersection Improvements <br />Polk County, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />d. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Tremayne is the design technician responsible for roadway plan production of this project. He also created exhibits <br />used in the intersection study. <br /> <br /> <br /> <br /> <br /> <br /> STANDARD FORM 330 (1/2004) Page 2