Luis E. Rodriguez, P.E. Site civil engineering design and
<br />permitting and construction 20 9
<br />Cordova Rodriguez & Assoc., Inc., Pembroke Pines, FL
<br />Bachelor of Science, Civil Engineering Professional Engineer, Florida
<br />Past President, American Society of Civil Engineers, Broward Section
<br />Miami Lakes, Miami Lakes, Florida
<br /> Ongoing N/A
<br />Public works inspections, plans examiner services, zoning applications review, and site plan review. Under this contract CRA performed
<br />plan review for site plan submittals. Included site plan review for for Miami Lakes West Fire Rescue Station 64 as submitted to the
<br />Planning, Zoning & Code Compliance Department and Building Department. It also included assistance to meetings and coordination
<br />with Miami Dade County Traffic Engineering and Public Works Departments for the proposed off-site improvements.
<br />
<br />Port Everglades Terminal 26, Fort Lauderdale, Florida
<br /> 2010-2013 2012
<br />The scope of work for the Port included design, permitting and construction observations. Relocation of existing catch
<br />basins, design of a surface water management system that included additional structures, exfiltration trench, and the
<br />rerouting of the drainage system to an existing outfall.
<br />
<br />Bronco Substation, Town of Davie, Florida
<br /> 2009 2012
<br />This project consisted of the design, permitting and construction for the Bronco Electrical Substation Expansion of approximately 1.44
<br />acres. The services for this facility included a precast decorative concrete wall, 2 new light poles and fire hydrant design. Provided
<br />design for fence, fill & grade, stormwater management, water and wastewater connection. Coordination with Central Broward Water
<br />Control District, Town of Davie Engineering Division and Florida Department of Environmental Protection among other agencies for
<br />permiting and approval of the work.
<br />
<br />Broward County Regional Reuse Master Plan, Broward County,
<br />Florida 2012-2013 N/A
<br />Coordination with stakeholders to deliver a current and comprehensive review of existing reuse infrastructure, operations and current
<br />permitting within and adjacent to Broward County. Collection of relevant data for use in the evaluation of a county-wide strategy for the
<br />most cost effective development and phased approach of beneficial reuse projects across Broward County as part of a regional reuse
<br />master plan. Evaulation of potential regional and sub-regional reuse projects within and across jurisdictional and service area
<br />boundaries acknowleging any timing, infrastructure or legislative constraints.
<br />
<br />Lormar Subdivision Improvements, Miami Dade County, Florida
<br /> 2008-2009 2010
<br />Research and project planning and design to replace the existing drainage system. The new system consisted of a connection of trench
<br />drain for better flow and distribution. This included review of existing record information including as-built drawings and specifications,
<br />reports, and photographs from the Department of Environmental Resources Management (DERM), Public Works Department (PWD),
<br />staff and area residents.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />15. FIRM NAME AND LOCATION (City and State)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br />a.
<br />b.
<br />c.
<br />d.
<br />e.
<br />STANDARD FORM 330 (REV. 3/2013)PAGE 2
|