Laserfiche WebLink
Luis E. Rodriguez, P.E. Site civil engineering design and <br />permitting and construction 20 9 <br />Cordova Rodriguez & Assoc., Inc., Pembroke Pines, FL <br />Bachelor of Science, Civil Engineering Professional Engineer, Florida <br />Past President, American Society of Civil Engineers, Broward Section <br />Miami Lakes, Miami Lakes, Florida <br /> Ongoing N/A <br />Public works inspections, plans examiner services, zoning applications review, and site plan review. Under this contract CRA performed <br />plan review for site plan submittals. Included site plan review for for Miami Lakes West Fire Rescue Station 64 as submitted to the <br />Planning, Zoning & Code Compliance Department and Building Department. It also included assistance to meetings and coordination <br />with Miami Dade County Traffic Engineering and Public Works Departments for the proposed off-site improvements. <br /> <br />Port Everglades Terminal 26, Fort Lauderdale, Florida <br /> 2010-2013 2012 <br />The scope of work for the Port included design, permitting and construction observations. Relocation of existing catch <br />basins, design of a surface water management system that included additional structures, exfiltration trench, and the <br />rerouting of the drainage system to an existing outfall. <br /> <br />Bronco Substation, Town of Davie, Florida <br /> 2009 2012 <br />This project consisted of the design, permitting and construction for the Bronco Electrical Substation Expansion of approximately 1.44 <br />acres. The services for this facility included a precast decorative concrete wall, 2 new light poles and fire hydrant design. Provided <br />design for fence, fill & grade, stormwater management, water and wastewater connection. Coordination with Central Broward Water <br />Control District, Town of Davie Engineering Division and Florida Department of Environmental Protection among other agencies for <br />permiting and approval of the work. <br /> <br />Broward County Regional Reuse Master Plan, Broward County, <br />Florida 2012-2013 N/A <br />Coordination with stakeholders to deliver a current and comprehensive review of existing reuse infrastructure, operations and current <br />permitting within and adjacent to Broward County. Collection of relevant data for use in the evaluation of a county-wide strategy for the <br />most cost effective development and phased approach of beneficial reuse projects across Broward County as part of a regional reuse <br />master plan. Evaulation of potential regional and sub-regional reuse projects within and across jurisdictional and service area <br />boundaries acknowleging any timing, infrastructure or legislative constraints. <br /> <br />Lormar Subdivision Improvements, Miami Dade County, Florida <br /> 2008-2009 2010 <br />Research and project planning and design to replace the existing drainage system. The new system consisted of a connection of trench <br />drain for better flow and distribution. This included review of existing record information including as-built drawings and specifications, <br />reports, and photographs from the Department of Environmental Resources Management (DERM), Public Works Department (PWD), <br />staff and area residents. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />15. FIRM NAME AND LOCATION (City and State) <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 3/2013)PAGE 2