Laserfiche WebLink
Equal Opportunity/Affirmative Action Employer <br />F. FIRM REFERENCES & SIMILAR WORK COMPLETED <br />City of Sunny Isles Beach | RFQ No. 16-12-01 <br />Professional Planning and Zoning Consulting Services, <br />including Civil and Traffic Engineering <br />Printed <br /> on <br />paper <br />25 <br /> <br /> <br /> CORDOVA RODRIGUEZ & ASSOCIATES, INC. <br /> February 2014 <br /> <br />Project Coordinator <br />Mr. Rodriguez is a licensed professional engineer and has 18 years of experience in civil engineering. <br />His project experience includes design of water distribution systems, sanitary sewer collection <br />systems, sanitary sewer pump stations and force main, paving and drainage design, management of <br />various land development projects, and permitting processing through various local and state <br />agencies. He has extensive experience in construction management and administration. <br />EXPERIENCE: <br />Miami-Dade County Public Works Department-Lormar <br />Drainage Subdivision Improvements: Responsible for the <br />design of the drainage improvements for the Lormar Subdivision <br />between SW 96th Terrace to SW 101st Street from SW 146th <br />Avenue to SW 147th Avenue; and SW 147th Avenue from SW <br />88th Street to SW 90th Street (approximately 1000 LF south of <br />SW 88th Street).The task included coordination with FPL and <br />other utilities to coordinate the placement of the proposed <br />exfiltration trench while minimizing utility conflicts and disruptions <br />to the residents. <br />Florida Power & Light Stirling Substation: Preparation of <br />design and construction documents for the expansion of an <br />existing electrical substation. Services provided included paving, <br />grading and drainage, storm water pollution prevention plan, and <br />construction observation. <br />Port Everglades Terminal 18: Project manager for the design, <br />permitting and construction observation for the Terminal 18 <br />expansion as required for the newest and largest single cruise <br />ship terminal in the world. Services included paving, drainage, <br />well design, water main extension and service, sewer main <br />extension and service, construction observation and <br />administration. <br />Port Everglades Terminal 21, North Port, & Terminal 18 <br />Phase I: Construction management and administration services <br />for the expansion/renovation of several cruise and cargo <br />terminals at Port Everglades. <br />Port Everglades Terminal 16: Project manager for the design, <br />permitting and construction observation for the Terminal 16 <br />container yard. Services included paving, drainage, well design, <br />water main extension and service, sewer main extension and <br />lateral, construction observation and final certification with Florida <br />Department of Environmental Protection (FDEP), Broward County <br />and the health department. <br />Luis E. Rodriguez, PE Cordova Rodriguez & Associates, Inc. <br />Education: <br />BS, Civil Engineering, 1993, <br />Cornell University,New York <br />Certifications: <br />Licensed Professional Engineer <br />in Florida <br />Employment: <br />Cordova Rodriguez & Associates, <br />Inc.:7 years <br />Employee of other Engineering <br />Firms:14 years <br />References: <br />Franklin Torrealba, PE <br />Director <br />300 Engineering Group, P.A. <br />(305) 763-9829 <br />