Laserfiche WebLink
Equal Opportunity/Affirmative Action Employer <br />F. FIRM REFERENCES & SIMILAR WORK COMPLETED <br />City of Sunny Isles Beach | RFQ No. 16-12-01 <br />Professional Planning and Zoning Consulting Services, <br />including Civil and Traffic Engineering <br />Printed <br /> on <br />paper <br />24 <br />1.866.367.4400 | www.johnsonengineering.com <br /> <br />Equal Opportunity/Affirmative Action Employer <br />Tremayne joined Johnson Engineering in 2004 and works in the transportation group as a designer III. <br />Tremayne has 15 years of experience and training in roadway design utilizing FDOT standardization. <br />Along with his experience, he possesses excellent organizational skills, highly motivated, creative and <br />commended for being a hard and resourceful employee. His skills include an array of software for not <br />only roadway design, but also computer visualization. <br /> <br />Tremayne is also responsible for the preparation of driveway connection permit application packages for <br />site development connection to state highways. His projects include sites requiring additional turn lanes <br />and modifications of roadway signs on state highways. He also analyses the traffic data and traffic reports <br />in order to prepare recommendations for entrance design. <br /> <br />Design Experience <br />¬ Bell Lake Road Safety Improvements, Pasco County - The Bell Lake Road project from east <br />of U.S. Highway 41 to Alpine Road consists of widening Bell Lake Road to provide a 24' wide <br />undivided urban roadway with a 6' wide concrete sidewalk on the northside of the road, a <br />stormwater conveyance system, bypass drainage connections, and a stormwater management <br />facility. Tremayne is the lead design technician responsible for roadway, drainage, and utility plan <br />production. <br />¬ U.S. 301 and County Road 54 Intersection Improvements, Pasco County - The U.S. 301 and <br />County Road 54 project consists of adding left turn lanes to County Road 54 on both sides of <br />U.S. 301, a dedicated westbound right turn lane on the east side of U.S. 301 and the redesign <br />of the existing traffic signal as a result of the additional lanes. Tremayne is the lead design <br />technician responsible for roadway, signal, and drainage plan production. <br />¬ Boyette Road and Wells Road Intersection Improvements, Pasco County - The Boyette Road <br />and Wells Road improvements project consist of providing a right turn lane for the northbound <br />traffic on Boyette Road, elongating the existing left turn lane for the Boyette road southbound <br />traffic, providing a left turn lane for the Wells Road westbound traffic, and adding a 6' wide <br />concrete sidewalk to the northside of Wells Road. Additional improvements will consist of new <br />traffic signals. Tremayne is the lead design technician on this project responsible for roadway, <br />drainage, signal and utility plan production. <br />¬ Collier Parkway Intersection Improvements, Pasco County - The Collier Parkway project <br />from Collridge Drive to Richardson Lane consists of widening Collier Parkway to the north to <br />add left turn lanes onto Bell Lake Road and Whitner Drive. Tremayne is the lead design <br />technician on this project responsible for roadway, and drainage plan production. <br />¬ Marine Parkway and Sea Forest Drive Sidewalks, Pasco County - The project consist of <br />designing horizontal and vertical geometry compliant to all Florida Department of <br />Transportation (FDOT) and American Disabilities Act (ADA) design requirements for <br />approximately 1.6 miles of new 6' wide concrete sidewalk. Tremayne is the lead design <br />technician responsible for sidewalk plan production of this project. <br />¬ Moon Lake Road Route Study, Pasco County - The project consist of defining the route right- <br />of-way needs along County Road 587 Moon Lake Road. Future widening from Nassau Drive <br />to S.R. 52 of existing two lanes to provide six lane divided roadway with turns at major <br />intersections. Tremayne is responsible for roadway design and the preparation of exhibits <br />utilized in the report, PowerPoint and public meetings for of this project. <br />¬ Oldwoods Avenue Route and Pond Study, Pasco County - The project consist of future new <br />four lane roadway within the Oldwoods corridor from Meadow Pointe Boulevard to Morris <br />Bridge Road. Tremayne is responsible for roadway design and the preparation of exhibits utilized <br />in the report, PowerPoint and public meetings for of this project. <br />¬ FDOT Connection Permit Applications - The Forum / Hess Mart at S.R. 82, Fort Myers, LaBelle <br />Riverside, LaBelle, and Hi Hat Ranch, Sarasota <br />TREMAYNE WHITFIELD <br />CAD Technician <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />twhitfield@johnsoneng.com <br />813.751.2657 <br /> <br /> <br />Years’ Experience <br />15 years <br /> <br />Education/Training <br />B.S. Computer Visualization <br />Technology (2001), <br />ITT Technical Institute <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />