Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) 12 NAME <br />NICHOLAS B. MAHON, PE 13 ROLE IN THIS CONTRACT <br />ENGINEERING 14. YEARS EXPERIENCE a TOTAL <br />10 YEARS b WITH CURRENT FIRM <br />1 YEAR 11 MONTH 15 FIRM NAME AND LOCATION (City and State) <br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA 16 EDUCATION (DEGREE AND SPECIALIZATION) <br />BACHELOR OF SCIENCE CIVIL ENGINEERING <br />UNIVERSITY OF CENTRAL FLORIDA <br />17 CURRENT PROFESSIONAL REGISTRATION <br />(STATE AND DISCIPLINE) <br />REGISTERED PROFESSIONAL ENGINEER <br />FL NO. PE78361 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Mahon’s experience includes working on multi-disciplinary, design-bid, and design-bid-build. Design experience includes roadway design, land development, general site design, ADA accessibility, stormwater management, water and wastewater improvements, comprehensive master plans and investigations of storm and sanitary systems. In addition, Mr. Mahon has performed Site Plan Reviews for the City of Weston, City of West Park, Town of Surfside, City of Pembroke Pines, City of Pahokee and Village of Estero. 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Davie Road Phase 1 <br />Davie, FL <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (if applicable) 2015 - 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project engineer for Davie Road from SR 84 to Nova Dr. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, roadway widening, sidewalk improvements to meet current ADA standards, add bike lanes, signalization at Nova Drive & Reese Road, pavement marking & signage for a six lane divided road, maintenance of traffic, drainage modifications, lighting, and tree removal/relocations. Review and respond to contractor provided shop drawings & RFI’s during construction. Project partially funded by a County Incentive Grant. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Davie Road Phase 2 <br />Davie, FL <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 - present CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager and Engineer of Record for Davie Road from SW 39th Street to Nova Dr. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, sidewalk improvements to meet current ADA standards, add bike lanes, signalization at SW 39th St and SW 37th St., pavement marking & signage for a four lane divided road, traffic control, lighting, and tree removal/relocations. Coordinate with design team to ensure project progresses on schedule. This included internal progress meetings, coordination with other disciplines, coordination efforts with client, budget control and invoice processing. Prepare and submit documents to comply with FDOT Local Agency Program (LAP) Funding requirements. Review and respond to contractor provided shop drawings & RFI’s during construction. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Andrews Avenue Roadway Improvements <br />Oakland Park, VA <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 - present CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager & Engineer of Record for Andrews Avenue from Oakland Park Blvd to Prospect Drive. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, reconstruction of existing sidewalks to meet current ADA standards, add bike lanes, mid-block crossings for pedestrians, pavement markings & signage for a four lane divided road, and lighting. Coordinate with design team to ensure project progresses on schedule. This included internal progress meetings, coordination with other disciplines, coordination efforts with client, budget control and invoice processing. Prepare and submit documents to comply with FDOT Local Agency Program (LAP) Funding requirements. <br />d. (1) TITLE AND LOCATION (City and State) <br />Dania Jai-Alai & Casino Offsite Improvements <br />Dania Beach, FL <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 - 2016 CONSTRUCTION (if applicable) 2015-2016 <br />29