Laserfiche WebLink
1.05 WORK SEQUENCE <br />A. Construct Work in stages to accommodate Owner's occupancy <br />requirements during the construction period, coordinate construction <br />schedule and operations with Owner. <br />B. Coordinate existing water treatment plant retrofit(s) with Owner's <br />requirements. <br />1.06 OWNER OCCUPANCY <br />A. Cooperate with Owner to minimize conflict, and to facilitate Owner's <br />operations. <br />B. Schedule the Work to accommodate this requirement. <br />1.07 WORK BY OTHERS <br />A. The Contractor is advised that work by others will take place during the <br />duration of the contract time. It shall be the Contractor's responsibility to <br />coordinate and schedule all work as not to delay or hinder his work or the <br />work by others. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />December 2006 01010 -2 06 -5723 <br />