My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01015 <br />GENERAL REQUIREMENTS <br />PART 1 - GENERAL <br />1.01 RELATED REQUIREMENTS <br />A. General provisions of Contract, including General and Supplementary <br />Conditions. <br />B. Requirements for determining completed Work - Section 01025. <br />1.02 PROJECT DESCRIPTION <br />A. The Project consists of general construction of a prefabricated restroom <br />building and new lighting and electrical throughout the park, in the City of <br />Sunny Isles Beach. <br />1.03 CONTRACTOR USE OF PREMISES <br />A. Contractor shall have full use of the premises for construction operations, <br />including use of the site. The Contractor's use of the premises is limited <br />only by the Owner's right to perform construction operations with its own <br />forces or to employ separate contractors on portions of the project. <br />B. The Contractor shall be responsible for coordinating his daily activities in <br />conjunction with any Contractors presently working within the City of <br />Weston. <br />C. Confine operations to areas within rights -of -way and easements. <br />D. Keep existing driveways and entrances serving the premises clear and <br />available to the Owner and the Owner's employees at all times. <br />1. Do not use these areas for parking or storage of materials. <br />2. Schedule deliveries to minimize space and time requirements for <br />storage of materials and equipment on site. <br />E. Do not dispose of organic and hazardous material on site, either by burial <br />or by burning. <br />1.04 ENVIRONMENTAL PROTECTION <br />A. Provide protection, operate temporary facilities and conduct construction <br />in ways and by methods that comply with environmental regulations, and <br />December 2006 01015 -1 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.