My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br />� I <br />i I <br />� I <br />1 <br />� I <br />� I <br />� I <br />� I <br />I I <br />DOCUMENT 01370 <br />SCHEDULE OF VALUES <br />PART 1 - GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Submit to the Engineer a Schedule of Values allocated to the various <br />portions of the Work, within 21 days after the effective date of the <br />Agreement. <br />B. Upon request of the Engineer, support the values with data which will <br />substantiate their correctness. <br />C. The Schedule of Values shall be used as the basis for the Contractor's <br />Applications for Payment. <br />1.02 RELATED REQUIREMENTS <br />A. Document 00700: Conditions of the Contract <br />B. Section 01152: Application for Payment <br />1.03 FORM AND CONTENT OF SCHEDULE OF VALUES <br />A. Type schedule on an 8 -1/2 inch x 11 inch or 8 -1/2 inch x 14 inch white <br />paper; Contractor's standard forms and automated printout will be <br />considered for approval by the Engineer upon Contractor's request. Identify <br />schedule with: <br />1. Title of Project and location <br />2. Engineer and Project number <br />3. Name and Address of Contractor <br />4. Contract designation <br />5. Date of submission <br />B. Schedule shall list the installed value of the component parts to include <br />earthwork /foundation, reinforced concrete, masonry, hollow core roof, <br />roofing material, painting /coatings, individual equipment, piping, electrical, <br />paving, of the Work (as required) in sufficient detail to serve as a basis for <br />computing values for progress payments during construction. <br />C. For the various portions of the Work: <br />1. Each item shall include a directly proportional amount of the <br />Contractor's overhead and profit. <br />December 2006 <br />01370 -1 <br />06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.