Laserfiche WebLink
B. On request of the Engineer, submit documentation to verify accuracy of <br />field engineering work. <br />C. Submit certificate signed by registered surveyor certifying that elevations <br />and locations of improvements are in conformance or non - conformance, <br />with Contract Documents. <br />D. Submit drawings showing locations of all structures constructed. This <br />drawing shall be included with the project record documents <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 — EXECUTION (Not Used) <br />END OF SECTION <br />December 2006 01050 -3 06 -5723 <br />