My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prohibiting stacking excavated material in the street, and requiring that the <br />trench shall not remain open overnight. <br />B. The Contractor shall take precautions to prevent injury to the public due to <br />open trenches. All trenches, excavated material, equipment, or other <br />obstacles which could be dangerous to the public shall be well lighted at <br />night. <br />1 <br />December 2006 <br />If, in the final inspection of the work, any defects, faults or omissions are <br />01505 -2 <br />06 -5723 <br />1.05 TEST PITS <br />' <br />A. <br />Test pits for the purpose of locating underground pipeline or structures in <br />advance of the construction shall be excavated and backfilled by the <br />Contractor at his cost at the direction of the Engineer. Test pits shall be <br />backfilled immediately after their purpose has been satisfied and the <br />surface restored and maintained in a manner satisfactory to the <br />Engineers. <br />' <br />PART 2 - <br />PRODUCTS (NOT USED) <br />PART 3 - <br />EXECUTION <br />3.01 COOPERATION WITHIN THIS CONTRACT <br />A. <br />All firms or persons authorized to perform any work under this Contract <br />shall cooperate with the General Contractor and his subcontractors or <br />trades, and shall assist in incorporating the work of other trades where <br />necessary or required. <br />B. <br />Cutting and patching, drilling and fitting shall be carried out where required <br />by the trade or subcontractor having jurisdiction, unless otherwise <br />indicated herein or directed by the Engineer. <br />3.02 PROTECTION OF CONSTRUCTION AND EQUIPMENT <br />A. <br />All newly constructed work shall be carefully protected from injury in any <br />way. No wheeling or walking or placing of heavy loads on it shall be <br />allowed and all portions injured shall be reconstructed by the Contractor at <br />his own expense. <br />B. <br />All structures shall be protected in a manner approved by the Engineer. <br />Should any of the floors or other parts of the structures become heaved, <br />cracked or otherwise damaged, all such damaged portions of the work <br />shall be completely repaired and made good by the Contractor at his own <br />expense and to the satisfaction of the Engineer. Special attention is <br />directed to substructure bracing requirements described in Section 02220. <br />1 <br />December 2006 <br />If, in the final inspection of the work, any defects, faults or omissions are <br />01505 -2 <br />06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.