Laserfiche WebLink
C <br />found, the Contractor shall cause the same to be repaired or removed and <br />replaced by proper materials and workmanship without extra <br />compensation for the materials and labor required. Further, the <br />Contractor shall be fully responsible for the satisfactory maintenance and <br />repair of the construction and other work undertaken herein, for at least <br />the guarantee period described in the contract. <br />Further, the Contractor shall take all necessary precaution to prevent <br />damage to any structure due to water pressure during and after <br />construction and until such structure is accepted and taken over by the <br />Owner. <br />I��I�Z�]�.yx��[�P►I <br />December 2006 01505 -3 06 -5723 <br />