Laserfiche WebLink
SECTION 02510 <br />WALKWAYS <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />A. Furnish all labor, materials and equipment necessary to complete all <br />walkways and related items shown in the drawings and specified herein. <br />1.02 REFERENCES <br />A. All materials and methods of construction shall conform to the <br />requirements of the "Florida Department of Transportation, Standard <br />Specifications for Road and Bridge Construction ". <br />1.03 SUBMITTALS <br />A. Submit to the Engineer, as provided in the General Conditions, shop <br />drawings showing dimensions and layouts of sidewalks and reinforcement <br />for concrete work. <br />1.04 RELATED WORK <br />A. Site preparation is specified in Section 02100. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. Concrete Materials: <br />1. Concrete for work under this section shall be no less than 3000 psi <br />at 28 days. <br />2. Reinforcing bars shall be deformed type bars conforming to <br />AASHTO M31 Grade 40 or 60. All reinforcing steel shall be shop <br />fabricated, of size, cross - section and arrangement as described on <br />approved shop drawings. <br />3. Welded wire fabric shall be as shown on the drawings and shall <br />conform to all requirements of AASHTO M55. <br />4. Expansion joint material shall be 1/2 inch or 3/4 inch thickness <br />where shown, bituminous type meeting AASHTO spec. M- 213 -65. <br />5. Joint sealant shall be hot poured rubber confirming to Fed. Spec. <br />SS -S -164. <br />December 2006 02510 -1 06 -5723 <br />