My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�J <br />[i <br />u <br />B. Base Course Material: <br />1. Base course material shall be graded aggregate conforming to the <br />FDOT. <br />PART 3 - EXECUTION <br />3.01 INSTALLATION <br />A. Sub -grade shall be thoroughly compacted as specified in Division 2. <br />B. Forms shall conform to the shapes, lines and dimensions of the members <br />as called for on the plans and shall be substantial and sufficiently tight to <br />prevent leakage of mortar. They shall be properly braced or tied together <br />so as to maintain position and shape. <br />C. Finishing: <br />1. Float concrete until 1/4 -inch cement gel is brought to surface, steel <br />trowel until dense surface is obtained. <br />2. Finish with broom at right angles to alignment of work, then round <br />all exterior edges with 3/4 -inch radius after brooming. <br />D. Curing: <br />1. Cover walks with sand, sawdust or shavings and keep wet for three <br />(3) days. <br />2. Cover walks until final clean -up to prevent damages. <br />3. Other methods of curing may be used subject to approval of the <br />Engineer prior to implementation. <br />E. Concrete walks shall be constructed to lines, widths, grades and thickness <br />as shown on the Drawings, but sloped not less than 1/8 -inch per foot in <br />direction of water flow. Concrete shall be placed on thoroughly <br />compacted subgrade, having smooth surface and kept moist until time <br />concrete is placed. <br />1. Isolation joints shall be installed at all intersections with other <br />walks, at head and bottom of steps, curbs and maximum 12 -foot <br />O.C. in runs. Expansion material shall be 1/2 -inch thick, but not <br />less than 1/4 -inch, by depth of concrete; 3/4 -inch thick were <br />abutting curbs and gutters, and at parking bays. Expansion <br />material shall extend from bottom of walk slab to within 1/2 -inch of <br />top, to be filled with poured joint filler. <br />2. Dummy groves shall be 1/2 -inch x 1/2 -inch having 1/2 -inch aprons. <br />F. Local conditions, codes and practices shall govern all drive cuts and <br />aprons. <br />December 2006 <br />02510 -2 <br />06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.