Laserfiche WebLink
SECTION 03300 <br />CAST -IN -PLACE CONCRETE <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />A. Furnish labor, materials, equipment and incidentals required to place <br />cement and concrete masonry, reinforcing steel, forms, waterstops and <br />miscellaneous related items including sleeve, reglets, anchor bolts, inserts <br />and embedded items specified under other Section. <br />1.02 RELATED WORK <br />A. Testing is specified in Section 01410. <br />B. Concrete reinforcement is specified in Section 03200. <br />C. Precast Concrete Hollow Core Plank is specified in Section 03415. <br />D. Joints are specified in Section 03251. <br />E. Walkways are specified in Section 02510. <br />1.03 REFERENCE <br />A. ASTM C -150 Portland Cement <br />B. FS SS -C- 1960/3 Portland Cement <br />C. ASTM C -94 Ready -Mix Concrete <br />D. ACI 318 -89 Reinforced Concrete <br />E. ASTM C -143 Concrete Mix <br />F. ASTM C -231 Concrete Testing <br />G. ASTM C -33 Concrete Aggregates <br />H. ASTM C -87 Mortar Strength <br />I. ASTM C -40 Concrete Aggregates <br />December 2006 03300 -1 06 -5723 <br />