My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hammer the grout into the hole until dense, and an excess of paste <br />appears on the surface in the form of a spider web. Trowel smooth with <br />heavy pressure. Avoid burnishing. <br />D. Rub lightly with a fine carborundum stone at an age of I to 5 days if <br />necessary to bring the surface down with the parent concrete. Exercise <br />care to avoid damaging or straining the virgin skin of the surrounding <br />parent concrete. Wash thoroughly to remove all rubbed matter. <br />G. In cases where the Embeco is employed in multiple patches and a rusty <br />finish is not desired on the surface, such as exposed faces of walls, etc., <br />the final layer (or at least the final 1/2 inch) shall be composed of the 1 1.5 <br />grout without Embeco. After hardening, rub lightly as described above for <br />form tie holes. <br />December 2006 03300 -16 06 -5723 <br />E. Defective concrete and honeycombed areas shall be chipped reasonably <br />square and at least 1 inch deep to sound concrete by means of hand <br />chisels or pneumatic chipping hammers. Irregular voids or surface stones <br />need not be removed if they are sound, free of laitance, and firmly <br />embedded in the parent concrete, subject to Engineer's final inspection. If <br />honeycomb exists around reinforcement, chip to provide a clear space at <br />' <br />least 3/8 inch wide all around the steel. For areas less than 1 1/2 inch <br />deep, the patch may be made in the same manner as described above for <br />r(nontrowelable) <br />filling for tie holes, care being exercised to use adequately dry <br />mixtures and to avoid sagging. Thick repairs will require <br />build -up in successive 1 1/2 inch layers on successive days, each layer <br />being applied (with slurry, etc.) as described above. To aid strength and <br />bonding of the multiple layer repairs, the Engineer may order the use of <br />Embeco non - shrink, metallic aggregate by the Master Builders Company, <br />' <br />Cleveland, OH or Ironite by Fox Industries, Madison IL as an additive as <br />follows.. <br />Material Volumes Weights <br />Cement 1.0 1.0 <br />Embeco 0.15 0.25 <br />' <br />Sand 1.5 1.5 <br />F. For very heavy (generally formed) patches; the Engineer may order the <br />addition of pea gravel to the mixture and the proportions modified as <br />follows.. <br />' <br />Material Volumes <br />Weights <br />Cement 1.0 1.0 <br />Embeco 0.2 0.33 <br />Sand 1.0 1.0 <br />Pea Gravel 1.5 1.5 <br />G. In cases where the Embeco is employed in multiple patches and a rusty <br />finish is not desired on the surface, such as exposed faces of walls, etc., <br />the final layer (or at least the final 1/2 inch) shall be composed of the 1 1.5 <br />grout without Embeco. After hardening, rub lightly as described above for <br />form tie holes. <br />December 2006 03300 -16 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.