Laserfiche WebLink
SECTION 00100 <br />INSTRUCTIONS TO BIDDERS <br />1. DEFINITION OF TERMS <br />1.1 Bidding Documents - these include the Advertisement for Bid, Instructions to Bidders, <br />Bid Form, sample bidding and contract forms, proposed Contract Documents as defined <br />in the General Conditions and any Addenda issued prior to receipt of bids. <br />1.2 Total Base Bid - the amount stated on the Bid Form for which the Bidder offers to <br />perform the Work as described in the Bidding Documents. <br />1.3 Unit Price Bid - the amount stated in the Bid Form as a price per unit of measurement for <br />materials or labor as described in the Bidding Documents. <br />1.4 Addenda - written and graphic documents issued by the Engineer prior to the execution <br />of the Contract to modify or interpret the Bidding Documents. <br />1.5 General Conditions — 2002 Version of the Standard General Conditions of the <br />Construction Contract. <br />1.6 Any Capitalized terms contained here -in (e.g. Owner, Engineer, Work, Agreement, <br />Contract) and is not defined above are contained in the General Conditions Article 1 — <br />Definitions and Terminology. <br />2. BIDDING DOCUMENTS <br />2.1 Complete sets of Bidding Documents may be obtained from the office of the City Clerk <br />as stated in the Advertisement for Bid. <br />2.2 Complete sets of Bidding Documents shall be used by Bidders in preparation of Bids; <br />neither the Owner nor the Engineer assume any responsibility for errors or <br />misinterpretations resulting from the use of incomplete sets. <br />2.3 Bidding documents consist of this project manual along with the following construction <br />plans titled: <br />a. Town Center Park Restrooms and Lighting Improvements <br />Bid No. 06 -12 -01 <br />CGA Project No. 06 -5723 <br />3. EXAMINATION OF DOCUMENTS AND SITE <br />3.1 Bidders shall visit the site of the proposed work and become familiar with the nature and <br />extent of work to be performed and local conditions that may affect the work. <br />3.2 The Bidding Documents were prepared to present an essentially accurate representation <br />of existing conditions, interpreted from available information on the site. The Bidder is <br />not relieved, however, of the responsibility of becoming fully informed as to existing <br />conditions at the site. <br />December 2006 - <br />00100 1 06 -5723 <br />