My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:40:55 AM
Creation date
1/24/2011 10:59:29 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t3.3 <br />Bidders shall examine existing site improvements, and conditions, utilities, and streets to <br />determine all conditions, which will affect the Work. <br />4. INTERPRETATION <br />OF BIDDING DOCUMENTS <br />4.1 <br />All questions requiring clarification or interpretation of the Bidding Documents shall be <br />' <br />made in writing and shall reach the office of the Owner at least 5 days prior to the date <br />for receipt of bids. Direct all requests to the attention of the Project Engineer at Calvin, <br />Giordano & Associates, Inc., 1800 Eller Drive Suite 600, Fort Lauderdale, FL 33316; <br />Fax: 954 - 921 -8807; Phone: 954 - 921 -7781. <br />4.2 <br />Any modification or interpretation of the Bidding Documents will be made by Addendum <br />to all who are recorded by the Engineer as having received a complete set of Bidding <br />Documents. <br />4.3 <br />Interpretations or modifications of Bidding Documents made in any manner other than by <br />Addendum will not be binding. <br />4.4 <br />A Bidder, prior to submitting his Bid, shall ascertain that he has received all Addenda <br />iissued, <br />and shall acknowledge their receipt in the Bid Form. <br />5. SUBSTITUTIONS <br />5.1 <br />Bidders represent that their Bid is based upon the materials and equipment described in <br />the Bidding Documents. <br />5.2 <br />Requests for substitutions will be considered prior to receipt of bids if they reach the <br />Engineer at least 5 days prior to the date for receipt of bids. <br />5.3 <br />Acceptance by the Engineer of a proposed substitution will be issued in the form of an <br />Addendum or Substitution Request Form. <br />' <br />6. QUALIFICATION OF BIDDERS <br />6.1 <br />If requested, the Bidder shall submit to the Engineer, prior to award of contract, a <br />properly completed Contractors Qualification Statement, along with any other evidence <br />of his satisfactory experience and ability to perform the proposed Work. <br />6.2 <br />If requested by the Owner, the Bidder shall submit a certified financial statement, <br />prepared within the past 30 days, indicating current financial resources, liabilities, capital <br />equipment, and past history performance. <br />' <br />following <br />6.3 <br />Bidders may be disqualified and their bids rejected for any of the specific <br />reasons: <br />' <br />Reason believe that Bidders. <br />a. to collusion exists among <br />b. Determination of lack of competency as may be revealed by qualification <br />statements, financial statements, experience records, or other questionnaires. <br />1 <br />C. The Bidder's uncompleted work load which in the judgment of the Owner, may <br />cause detrimental impact on prompt completion of this project. <br />d. The Bidder is involved in any litigation against the Owner. <br />' <br />December 2006 <br />00100 -2 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.