My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(06-12-02) General Engineering Consultants
>
Responses
>
Calvin Giordano & Assoc.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:15:21 AM
Creation date
1/24/2011 3:18:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
06-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i #} �f Fiord o socia s, nc. <br />Golden Glades Interchange and the Florida Turnpike. Responsible for the surface water management <br />portion of the interchange reconstruction project. Specific duties include surface water management modeling <br />and the preparation of the complete drainage structure plans. <br />S.R. 1 /U.S. -1 Dualization. Responsible for the hydrologic and hydraulic portions of the project. Duties include <br />evaluation of the historical and existing flood patterns and the preparation of the proposed surface water <br />management system. Prepared the complete drainage construction plans. Prepared the bridge hydraulic report. <br />SW/NW 27th Avenue, Miami, Florida. In charge of the hydrologic and hydraulic portions of the street <br />widening and reconstruction project including bridge widening backwater effect and hydraulic study and report. <br />Flagler Street, Miami, Florida. In charge of the hydrologic and hydraulic portions of the street widening and <br />reconstruction project including bridge widening backwater effect and hydraulic study and report. <br />Milam Dairy Road (NW 72nd Avenue), Miami, Florida. In charge of the hydrologic and hydraulic portions <br />of the street widening and reconstruction project including bridge widening backwater effect and hydraulic study <br />and report. <br />SR 710, Indiantown, Florida. In charge of hydrologic and hydraulic portions of the street widening and <br />reconstruction project. Developed surface water management system model and prepared the complete <br />drainage plans. <br />Route 1 -295, Trenton, New Jersey. Responsible for the complete drainage design for the proposed major <br />highway and three interchanges. Performed hydraulic studies for the proposed bridge. <br />Route 1 -78, Alfa, New Jersey. Responsible for the complete drainage design for the proposed major highway <br />and interchange. <br />Route 1- 295/1 -95 Interchange, Trenton, New Jersey. Responsible for the complete drainage design for the <br />proposed major highway and interchange <br />
The URL can be used to link to this page
Your browser does not support the video tag.