Laserfiche WebLink
Associates, <br />SR- 5 /US -1 Parker Bridge. This project assessed the impacts of replacing and widening a bascule bridge <br />from a four lane to a six -lane structure. The study examined the impacts for three different bridge alternatives. <br />Jungle Trail in Indian River County. This project included a Phase 1 PD &E evaluation of enhancement <br />improvements to the historic Jungle Trail, which paralleled the Indian River. Alternatives evaluated included <br />passive recreational uses, preservation of archaeological and environmentally significant sites, and stabilization <br />of the banks of the river. <br />Planning Study for SR -5 and FEC Grade Separation. This project evaluated the feasibility of constructing <br />an east -west grade separation over SR- 5 /US -1 and the FEC Railroad in Indian River County. Eight locations <br />within the county were evaluated for feasibility including benefit to cost analysis, environmental impacts and <br />socio- economic impacts. <br />