Laserfiche WebLink
<br />r <br /> <br />Q: Is there a problem with the turning radius in the 20' right-of-way? <br />A: That is probably going to cause a little bit of problem. At this point of the process, <br />we would like you to assume thatfor the purposes of submitting the proposal, that you have <br />adequate alignment. <br /> <br />Q: Whose canal is this? <br />A: We don't know, but for everyone's benefit, assume that the City has all necessary <br />clearances. <br /> <br />Q: Is there a desired speed? <br />A: The geometry is going to rule what the design speed is but you can assume it will be <br />around 25mph. <br /> <br />Q: Are there any restrictions of the North side? <br />A: Not that we are aware of <br /> <br />Q: Who will be funding this project? <br />A: The City. <br /> <br />Q: Will the bridge have to accommodate utilities? <br />A: FPL is currently negotiating to run some underground conducts. When they found <br />out about the bridge, they inquired if they might hang them. We are willing to work with <br />them, and other utilities, in this process. <br /> <br />Thank YOll all for your interest and your time. <br /> <br />Meeting adjourned at 10:40 a.m. <br /> <br />RI'(~ 07-tn-OJ J':nginccring Sns BriJgc (.\JJenJum.2) <br /> <br />Page 4 of 4 <br />