My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Corzo, Castella, Carballo
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-03-01) General Engineering Services
>
Responses
>
Corzo, Castella, Carballo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 2:25:47 PM
Creation date
1/26/2011 2:25:23 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Engineering Svcs.
Bid No. (xx-xx-xx)
07-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />Professional General Engineering Consultant for the North Bay Road Pedestrian and Emergency Vehicle Bridge, <br />and the Town Center Park Observation Deck and Boardwalk <br />Request for Qualifications # No. 07-03-01 <br />Page 2 <br /> <br />I <br /> <br />I <br /> <br />overlooks. This unique combination of experience will ensure that the Project Manager will proceed <br />with a special sensitivity to the two most crucial aspects of the project. <br /> <br />I <br /> <br />To assist in the Project Management duties, we have assigned Silvia Beltre, P.E. as the Assistant <br />Project Manager for the project. As you will see from our Project Approach, we feel that this project <br />should be handled in a manner similar to an FDOT Project Development and Environment (PD&E) <br />Study. Ms. Beltre is our leading expert in the performance of PD&E projects and has the experience to <br />marshal the resources to properly execute the data gathering and decision making process that will result <br />in a successful project. <br /> <br />I <br /> <br />I <br /> <br />Robert T. Carballo, P.E. will be the Principal-in-Charge for C3TS. As both the President of C3TS and <br />the Principal in charge of the Transportation Division, he is in the ideal position to ensure that all <br />necessary resources are made available for this project. <br /> <br />I <br /> <br />Manuel Solaun, P.E. is the head of the C3TS Bridge Structures Department and will lead the Structural <br />design for this project. Mr. Solaun has been a leader in bridge design in South Rorida for over 34 years <br />and has experience in all kinds of bridge structures. This extensive experience will allow us to think <br />outside the box in the design of this unique structure. <br /> <br />I <br /> <br />I <br /> <br />In addition to our own in-house capabilities, C3TS has teamed with Consulting Engineering & <br />Science, Inc. (CES) to provide Environmental Consultation and Permitting. We have carefully <br />considered the important environmental implications of this corridor and determined that CES is, by-far <br />the best firm for this project. We have worked with CES for many years and found them to be the most <br />knowledgeable and responsive environmental consultants in the region. <br /> <br />I <br /> <br />I <br /> <br />For construction expertise, we have supplemented our team with the firm of KMEC represented by <br />Kourouche Mohandes, P.E. Together with our in-house CEI department, Mr. Mohandes will provide <br />Construction Oversight as well as Constructability Reviews during design. Formerly with the Rorida <br />Department of Transportation, Mr. Mohandes has extensive experience in relevant construction projects. <br /> <br />I <br /> <br />To complete our team, we have added several other high quality sub-consultants. The firm of <br />Rosenberg Gardener and Associates have joined us to provide Landscape Architecture and will assist <br />in the master planning of the pedestrian aspects of the project. We have also added the firm of HR <br />Engineering for Geotechnical services and the firm of C.H. Perez and Associates for Surveying <br />servIces. <br /> <br />I <br />I <br /> <br />I <br /> <br />As to staffing requirements, C3TS has an adequate number of local professional engineers on staff to <br />service your projects adequately. Currently, the firm is nearing completion on a number of major design <br />projects and will have available staff capable of being assigned to new projects C3TS is prepared to <br />commit personnel as needed for these projects. <br /> <br />I <br /> <br />We thank you for the opportunity to outline our team's qualification and would look forward to working <br />with the City. <br /> <br />Respectfully Submitted, <br /> <br />I <br />I <br /> <br />Corzo Castella Carballo Thompson Salman, P.A. <br /> <br />~~ <br /> <br />Jeffrey S. Crews, P.E. <br />Vice President <br /> <br />I <br /> <br />3996 NW 9th ^ venue. FOIt Lauderdale. Florida 33309 <br />www.c3ts.com <br /> <br />954.565.2113 800.448.0227 Fax 954.567.4079 <br />Equal OppoItunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.