Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />ba <br /> <br />,., <br />Bermello Ajamil & Partners. Inc, <br /> <br />Professional General Engineering Consultant <br />for the North Bay Road Pedestrian and Emergency Vehicle Bridge, <br />and the Town Center Park Observation Deck and Boardwalk <br />Miami-Dade County <br /> <br />To offset the cost of mitigation. the following may be offered to the regulatory <br />agencies: <br /> <br />· Removal of exotic species among the existing mangroves, <br />· On-site mitigation in the form of additional mangrove plantings, <br />· Retrofit existing storm water outfalls with state of the art water quality treatment <br />units such as Stormceptor or CDS units, <br /> <br />Permitting Time Frame <br />The following is the approximate time frame expected to process the environmental <br />permits: <br /> <br />· DERM Class-I Permit (9 to 12 months) <br />· DEP Environmental Resource Permit (9 to 12 months) <br />· US Army COE Dredge and Fill Permit (12 to 18 months) <br /> <br />A variety of protected species may affect the duration of the permitting process as <br />well as some of the Specific Conditions ultimately made a part of the final permits, <br />These include but are not limited to some of the following: <br /> <br />· Essential Fish Habitat (EFH) <br />Because of the federal permitting required, the National Marine Fisheries <br />Service (NMFS) will evaluate the project and its potential for impact to EFH, <br />These impacts (if any) may be addressed by a variety of means. but could <br />require additional time during the permitting process, <br /> <br />· Johnson's Sea grass <br />Johnson's seagrass is a Federally listed, threatened species, Should this species <br />be observed within the project footprint. additional coordination with NMFS will <br />be needed to determine if the project will have no effect or may affect but not <br />likely to adversely affect the seagrass, <br /> <br />Manatee and Smalltooth Sawfish Protection During Construction <br />The project site is within Manatee and Small tooth Sawfish habitat. Both species are <br />protected by the Endangered Species Act of 1973, Therefore, a Protection Plan <br />must be in effect at all times during construction of the project, <br /> <br />Landscape Architecture <br />The concept that this project is much more than a bridge or pedestrian connection <br />is key to the approach that the B&A team will take in developing the design <br />solutions for this assignment, The successful design of the pedestrian environment <br />is an important part of developing a quality Town Center and this project offers <br />the opportunity to set a high standard in creating such an environment. With the <br />careful selection of materials and components of the pedestrian environment such <br /> <br />~ rClTY OF SUNNY ISLES BEACH, <br /> <br />www.bermelloajamil.com <br /> <br />9 <br />