My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1672
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 2:29:45 PM
Creation date
1/27/2011 10:14:28 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1672
Date (mm/dd/yyyy)
01/20/2011
Description
1st Amd to Agmt w/Tally Engineering, Add’l Inspection Srvs: Heritage Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TALLY ENGINEERING, INC. <br /> <br />C0nsult:l1~ En,!:! inct'rs <br /> <br />December 13,2010 <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br /> <br />Attention: <br /> <br />Rick Conner <br />City Manager <br /> <br />Subject: <br /> <br />CIVIL ENGINEERING INSPECTION AND CERTIFICATION FOR ITEMS OF <br />WORK ASSOCIATED WITH THE 2ND PHASE OF CONSTRUCTION AT <br />HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH <br />MIAMI-DADE COUNTY, FLORIDA <br /> <br />Dear Mr. Conner: <br /> <br />Tally Engineering and Materials Testing, Inc. per your request is pleased to provide this scope of work <br />and price proposal for the Civil engineering services for Phase II of the contract for Heritage Park at <br />Sunny Isles Beach. This proposal presents our qualifications to perform the required services, our <br />understanding of the proposed construction, the required scope of services, and an estimate of our costs. <br />The proposal is based on specification and drawings designed by Spillis Candela DMJM, dated <br />March/20 1 0 <br /> <br />Tally Engineering herby guarantees a lump sum fee to perform all the following inspection services through <br />the completion and certification of this proj ecl. The total cost of the inspection and construction monitoring <br />services for civil engineering and materials testing for the lump sum of$36, 000. <br /> <br />Shoulg"you have any questions regarding the information presented herein, please feel free to call our office. <br /> <br /> <br /> <br />s~~ ~ <br /> <br />.---' <br />TALLY ENGINEERING lNe <br /> <br />Pirooz Borojerdi, P.E. <br />President <br /> <br />ATTACHMENT "A" <br /> <br />1806 N, Flamingo Road; Suite 300 <br />Pembroke Pines. FL 33028 <br />Phone: (954) 447-0324 Fax: (954) 447-0674 <br /> <br />5377 N. Hiatus Rd. <br />Sunrise, F/, 33351 <br />Phone: (954)743-9301 Fax: (954) 746-4120 <br /> <br />SI8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.