My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2011-1672
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2011
>
Reso 2011-1672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 2:29:45 PM
Creation date
1/27/2011 10:14:28 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2011-1672
Date (mm/dd/yyyy)
01/20/2011
Description
1st Amd to Agmt w/Tally Engineering, Add’l Inspection Srvs: Heritage Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br /> <br />HERITAGE PARK AND PARKING GARAGE <br />CITY OF SUNNY ISLES BEACH <br /> <br />December 13,2010 <br />MIAMI-DADE COUNTY, FLORIDA <br /> <br />SCOPE OF SERVICES <br /> <br />A. CIVIL INSPECTION SERVICES <br /> <br />. Perform laboratory Proctor tests in accordance with AASHTO T -180 (Modified <br />Proctor) on existing or proposed backfill and sub-grade materials; <br />. Perform laboratory Limerock Bearing Ratio test PM 5-515on proposed subgrade <br />materials; <br />. Civil engineer to verify the placement of pipe, box culverts and all structures prior to <br />backfilling operation; <br />. Engineering technicians at the job site to perform in-place field density tests m <br />accordance with ASTM D-2922 (Nuclear Gauge Method); <br />. Record the deep well report and verify the length of the deep well; <br />. Deep well inspection; <br />. Inspect and approve all open infiltration; <br />. Perform inspection and testing for sand compaction for all pavers; <br />. Perform inspection and testing for sidewalk; <br />. Perform all the inspection and concrete testing for all architectural elements; <br />. Perform inspection and testing for water line; <br />. Perform inspection and testing for sewer line; <br />. Inspect and approve water and sewer connections; <br />. Perform inspection and testing for drainage line; <br />. Inspect and approve asphalt placement; <br />. Inspect and approve all signings and pavement markings; <br />. Upon completion of the assigned work the engineer shall complete and sign the <br />appropriate forms certifying that to the best of his knowledge the work is in <br />conformance with the approved plans and specifications, and the applicable <br />workmanship provisions of the code; <br />. Issue certification for all water sewer and all engineering work associated work <br />performed; <br />. All signed and sealed reports will be submitted as part of certification; <br /> <br />We will provide field representatives to conduct field inspections. Our office personnel will prepare <br />and distribute by regular mail the inspection reports which will be signed and sealed by a State of <br />Florida Registered Professional Engineer. We will follow contractor safety procedures; participate <br />in all his safety and toolbox meetings. <br /> <br />Notes: <br /> <br />1. Overtime is defined as time over 8 hours per day, Saturday and Sunday, and both time and <br />unit pricing will be charged at standard rate x 1.10. <br />2. All hourly inspection time will be charged as portal to portal from our office. <br />3. Estimate does not include stand-by time, cancelled activities or re-testing cost. <br />4. Stand-by and cancelled activities time will be charged at the appropriate rate <br /> <br />SiB <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.