|
<br />.
<br />.1
<br />el
<br />el
<br />.'
<br />
<br />I
<br />.'
<br />.1
<br />
<br />1:1
<br />
<br />I.'
<br />, I
<br />
<br />.;
<br />
<br />.:
<br />
<br />.'
<br />,
<br />e.
<br />.1
<br />.1
<br />.1
<br />e:
<br />e~
<br />.
<br />el
<br />.1
<br />.~
<br />1
<br />
<br />el
<br />e,
<br />-I
<br />-I
<br />.1
<br />.1
<br />I
<br />.
<br />.
<br />.1
<br />I
<br />
<br />.1
<br />.1
<br />I
<br />.1
<br />e~
<br />.;
<br />.!
<br />
<br />.:
<br />
<br />.:
<br />.'
<br />el
<br />e
<br />.
<br />
<br />I
<br />
<br />--1
<br />
<br />1
<br />
<br />NALDO GONZALEZ, P.E.
<br />Highway Design Manager - DC
<br />
<br />~~!!~I1L1-
<br />
<br />Page 2 ~,
<br />
<br />SR 10/US-90 Resurfacing from Apalachicola River to Quincy, Gadsden
<br />County (2005-2007). Project Manager responsible for the design and management of the signing and
<br />pavement markings and signalization components for this Resurfacing, Restoration, and Rehabilitation of
<br />16.4 77 miles of SR 10 (US90). Signalization improvements included upgrading the existing signals at four
<br />intersections. FDOT Project Manager: Wade Herod, P.E. (850) 638-0250.
<br />
<br />SR-826/Sunny Isles Boulevard Enhancement, Sunny Isles Beach (2003-2006) - Project Manager for this
<br />enhancement of SR 826 Eastbound/ Sunny Isles Boulevard from the Intercoastal Waterway bridge to SR A-1-
<br />AlCollins Avenue in Sunny Isles Beach, Florida. A Joint Project Agreement (JPA) project between the City of
<br />Sunny Isles Bach and FDOT, the project included the enhancement of the existing sidewalk through its
<br />widening and added landscape and lighting features. This widening of the sidewalk required the
<br />reconfiguration of the existing roadway, including the merging of the inside and outside business loops,
<br />through construction of new curb and gutter, relocation of drainage and the resurfacing and restriping of the
<br />roadway. Also included in the project was the upgrade to the existing signalization within the project. Mr.
<br />Gonzalez coordinated with several agencies, utilities and subconsultants for the successful completion of the
<br />project. City Project Manager: Mr. Jorge Vera (305) 957-1311
<br />
<br />SR A-1-A (Indian Creek Drive) Roadway Reconstruction, Miami-Dade County (2002-2004). Project
<br />Engineer responsible for the design of this urban reconstruction project. Mr. Gonzalez managed the project
<br />schedule, budget, and plans production. He also performed quality control on the roadway design and plans
<br />such as horizontal and vertical alignment, drainage, cross-sections, signing and pavement markings,
<br />signalization, and lighting. FDOT Project Manager: Dennis Fernandez (305) 470-5569.
<br />
<br />N.W. 14 Street Resurfacing and Widening, City of Miami (2002-2004). Project Manager responsible for
<br />the management of the design and plans production for the Resurfacing of NW 14 Street from NW 34 Avenue
<br />to NW 22 Avenue for the City of Miami Department of Capital Improvement. The project included the
<br />resurfacing of NW 14 Street, widening for paved shoulder, drainage improvements, pedestrian ramps, and
<br />construction of street parking areas (concrete grid pavers). Work included Roadway and Signing and
<br />Pavement Marking Plans, Drainage design and analysis, and estimates.
<br />City of Miami Department of Capital Improvement: Project Manager: Cesar Gonzalez (305) 416-1219.
<br />
<br />S.W. 69th Avenue Resurfacing, City of Miami (2002-2004). Project Manager responsible for the
<br />management and design for the pavement resurfacing and roadway rehabilitation to S.W. 69th Avenue, an
<br />urban collector, from Flagler Street to S.W. 8th Street for the City of Miami Department of Capital
<br />Improvements. The project also include the upgrade of the signing and pavement markings, driveways,
<br />sidewalk, and pedestrian ramps (ADA) throughout.
<br />City of Miami Department of Capital Improvement: Project Manager: Maria Lopez, P.E. (305) 416-1206.
<br />
<br />SR 714/ Martin Downs Boulevard 3R, Martin County (2001-2003). Project Manager responsible for the
<br />management and plans production of a Resurfacing, Restoration, and Rehabilitation of SR 714/Martin Downs
<br />Boulevard for FDOT District 4. Included the 3R Report, Lighting Analysis and Roadway and Signing and
<br />Marking Plans. FDOT Project Manager: Jose Velarde, P.E. (954) 777-4677
<br />
<br />SR 822 / Sheridan Street Intersection Improvement, Broward County (2002-2004). Project Manager
<br />responsible for the management and plans production of a Intersection Improvement and SR 822/Sheridan
<br />Street and N. 52 Avenue for FDOT District 4. Included the 3R Report, lighting analysis and Roadway and
<br />Signing and Marking Plans. This project was successfully electronically signed, sealed and delivered for a
<br />successful electronic letting (4/24/05). FDOT Project Manager: Bing Wang, P.E. (954) 777-4406
<br />
<br />SR A-1-A (Ocean Drive) Lighting and Signalization, Broward County (2002-2003). Project Engineer
<br />responsible for the design and plans production for signalization and decorative lighting along SR A 1 A in the
<br />City of Lauderdale by the Sea for FDOT District 4. FDOT Project Manager: Jose Velarde (954) 777-4677.
<br />
<br />SR 826 Connector Ramp at Golden Glades Interchange, Miami-Dade County (2000). Mr. Gonzalez was
<br />responsible for providing design recommendation sand guidance for post design services of this roadway
<br />project during construction. Roadway improvements for this project included the widening, restriping, and
<br />signing of the ramps of this major interchange for adding lanes and the upgrading of safety devices to meet
<br />standards. FDOT District Six Project Manager: Danny Iglesias, P.E. (305)470-5289.
<br />
|