Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />. <br />. <br />. <br />. <br />I <br />tp <br />. <br />~ <br />. <br />tp <br />. <br />. <br /> <br />I <br />. <br />I <br />. <br />. <br />~ <br /> <br />I <br />. <br />I <br /> <br />. <br />I <br />. <br />. <br />. <br />. <br />.. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />GUIDO VAN MEEK, P.E. <br />Utility Coordination <br /> <br />~!!~, <br /> <br />Page 2 <br /> <br />F.E.M.A. Drainage Project. Miami-Dade County, FL (2001 - 2002). New storm drainage system design, to <br />alleviate the spread flooding experienced during the most recent (Irene and No-Name) storms that affected <br />the County. Work includes, water management analysis of the existing conditions, new design, coordination <br />with other consultants including surveyors, utility coordination and construction coordination and cost <br />estimates. Contact: Eduardo A. Vega, P.E. (305) 372-6401 <br /> <br />Hadley Park Community Center, Miami, FL (2003 - 2005). Civil engineering services including, Paving, <br />grading and drainage design, water main extension and sanitary sewer collection system to serve the <br />center, coordination with the City of Miami Parks and Recreation Dept. and on their behalf with the State <br />and local regulatory agencies, utility coordination, permitting process, and construction supervision. <br />Contact: Li Gurau (305) 755-7834. <br /> <br />Hidden Lake Office Park, Miami-Dade County, FL (2003 - 2005). Mr. van Meek served as project <br />manager under this contract. His responsibilities were to provide consulting civil engineering services <br />including, access roadway improvements, water transmission and distribution system and sanitary sewer <br />collection and disposal system, to serve 16.5 acres of a commercial property containing, (7) office buildings, <br />(1) 140 seats restaurant, and (1) 120 rooms hotel at S.W. 127 Avenue and S.W. 128 Street, in Miami-Dade <br />County, Florida. He was personally responsible for the preliminary engineering and design services, <br />negotiations with the regulatory agencies, permitting process, and construction administration. Contact: Li <br />Gurau (305) 755-7834. <br /> <br />Hadley Park, Swimming Poll and Recreation Area Complex., Miami, FL (2003 - 2005). Civil engineering <br />services including, Paving, grading and drainage design, water main extension and sanitary sewer <br />collection system to serve the complex, coordination with the City of Miami Parks and Recreation Dept. and <br />on their behalf with the State and local regulatory agencies, utility coordination, permitting process, and <br />construction supervision. Contact: Li Gurau (305) 755-7834 <br /> <br />Miami Cerebral Palsy Cluster Homes I, II, 11/ and IV, Miami-Dade County, FL (2004 - 2005). Civil <br />engineering services for (4) prototype cluster homes including, on-site paving and drainage design, water <br />main extensions and distribution and sanitary sewer collection including pump stations. Mr. Van Meek <br />responsibilities included, preparation of construction contract documents, permitting process, coordination <br />with regulatory agencies on client's behalf, cost estimating, assistance to the client during bid process, and <br />construction supervision. Contact: AI Lopez, Astor Development Group (305) 858-6911. <br /> <br />Miami International Airport (MIA) Perimeter Road Expansion, Miami, FL Value Engineering. This <br />project consisted of reconstructing Perimeter Road along the south portion of the airfield, realigning <br />Perimeter Road along the east side of the Fuel Farm to NW 20th. Street, interfacing with the proposed <br />Perimeter Road Bridge and Central Boulevard Master Plan and providing a new connection from the <br />existing North Service Road north to the Northeast Base and Building 5A. Cost savings after Value <br />Engineering study ranged from ($2.9) to ($6.2) million, a potential (20.6%) expense reduction. <br /> <br />Port of Miami Cruise Terminals 8 & 9, Parking Garage, Miami, FL Value Engineering. The scope of <br />project was to duplicate the Parking Garage for terminals 3,4 and 5 and to reorient on new site located <br />adjacently south of Passenger Terminal 8 & 9, including the relocation of all utilities and complete redesign <br />of the storm drainage system. <br /> <br />Utility Coordination Projects Completed: <br /> <br />Sunny Isles # 2003009.001, 80 holes Completed; NW 25th Street # 0099001.002 (east)251 holes, 200 <br />holes Completed; NW 25th Street #0099001.003 (west), 125 holes, 152 holes Completed; Indian creek <br />#2002011.00,239 holes, 215 holes completed; CMC 2610 Tiger Tail # 2004001,7 holes Completed; City <br />of Miami # # 2004006, Pipe designing and 5 holes completed; II Luugano #2004009, 9 Holes Completed; <br />City of Miami" Greenway" #2004006.00, 38 Holes Completed. <br />