Laserfiche WebLink
<br />. <br />, . <br />i. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />~ <br />- <br />. <br />. <br />. <br />. <br />I <br />- <br />~ <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />. <br /> <br />-1 <br /> <br />PETE DIAZ, P.S.M. <br /> <br />~!!~IDt}_ <br /> <br />Page 2 ~, <br /> <br />Surveying Manager <br /> <br />SR 5 (US1) from SW 304 St. to SW 264 St., Miami, Florida (2002). Mr. Diaz was the Survey Project <br />Manager responsible for the direction of survey activities. This project entailed the acquisition of raster <br />imagery, DTM, Topography, Project Network Control, Right-of-Way mapping, GPS control. Project <br />Manager: Harold Desdunes, P.E. (305) 470-5271. <br /> <br />SR 997 (Krome Avenue) from SW 296 St. to SW 216 St., Miami, Florida (2002). Mr. Diaz was the <br />Survey Project Manager responsible for the direction of survey activities. This project entailed the <br />preparation of approximately 50 parcel sketches requiring, Right-of-Way mapping, GPS Control, Baseline <br />and vertical control. Project Manager: Monica Diez, P.E. (305) 470-5217. <br /> <br />Bus lanes (Along US1) from SW 264 St. to SW 112 Ave., Miami, Florida (2002). Mr. Diaz was <br />responsible for the oversight of field procedures, survey data analysis and processing. Coordinated with <br />contractors for delivery of data. Project Manager: Harold Desdunes, P.E. (305) 470-5271. <br /> <br />Miami Intermodal Center, Miami, Florida (2001). Mr. Diaz was in charge of reviewing and analyzing <br />several projects for quality control and compliance with Department standards. Project Manager: David L. <br />Futch, P.S.M. (305) 470-5410 <br /> <br />SR 933 (Everglades National Park), Miami, Florida (2000). Mr. Diaz was in charge of reviewing and <br />analyzing project for quality control and compliance with Department standards. Project Manager: Harold <br />Desdunes, P.E. (305) 470-5271. <br /> <br />Biscayne Engineering Co., Inc., Miami, Florida <br />July 1996 - August 1998 <br />Survey Technician <br /> <br />SR 848 (Stirling Rd), Broward County, Florida (1997). Mr. Diaz assisted in the preparation of Right-of- <br />Way maps, provided analysis of field data. Coordinate with Right-of-Way personnel at FDOT District 4 to <br />efficiently complete project. Project Manager: Selvin Bruce, P.S.M. (305) 324-7671. <br /> <br />Florida's Turnpike at Okeechobee Blvd., Palm Beach County, Florida (1997). Mr. Diaz was <br />responsible for the review of survey activities, analysis of survey data and the preparation of a full DTM. <br />Project Manager: David Del Rio, P.S.M. (305) 324-7671. <br /> <br />SR 826 from SW 56 St. to SW 40 St., Miami, Florida (1998). Assisted in the preparation of Right-of-Way <br />maps, provided analysis of field data and was responsible for Quality Control review. Project Manager: <br />Selvin Bruce, P.S.M. (305) 324-7671 <br /> <br />Weidener Surveying and Mapping, Inc., Miami, Florida <br />July 1989 - July 1996 <br />Survey Technician <br /> <br />U.S. Navy Submarine Base, Andros Island, Bahamas (1995). Mr. Diaz assisted Mr. O'Hargan in the <br />collection of Topographic data for the rehabilitation of a berm for explosives testing. Project Manager: Paul <br />T. O'Hargan, P.L.S. <br />