Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I <br />. <br />j <br /> <br />. <br />. <br />I <br />. <br />I <br />. <br />, <br />, <br />. <br />. <br />. <br />. <br /> <br />I <br />. <br />, <br />. <br />. <br />I <br />. <br />. <br /> <br />. <br />. <br />. <br />. <br />~ <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />OMAR CARCAMO <br /> <br />~~!!~, <br /> <br />Crew Chief <br /> <br />EDUCATION <br /> <br />South Ridge Senior High School, Miami, FL (Diploma) <br />Miami Dade Community College, Miami, FL (Associate in Arts in Electronics Engineering) <br />Florida International University, Miami, FI. (Present) <br /> <br />SUMMARY OF EXPERIENCE <br /> <br />Mr. Carcamo has over 12 years experience in the Land Surveying industry. His experience includes <br />horizontal and vertical control surveying, topographic, hydrographic, as-built survey, construction layout <br />and boundary surveys. Mr. Carcamo has worked for a variety of city, and county agencies, as well as <br />private clients. <br /> <br />He is experienced with Sokia Radian IS & Topcon Hiper Pro (GPS) surveying equipment and with <br />various total stations and levels out in the market today. <br /> <br />SPECIFIC PROJECTS <br /> <br />Marlin Engineering, Inc., Miami, Florida <br />May 2003 - Present <br />Crew Manager <br /> <br />NW 25 St from NW 87 Ave to NW 67 Ave Miami, Florida. (2003 - 2004). As crew chief Mr. Carcamo <br />was in-charge of recovering the control network, Right of way location, Topo location & DTM. Layout I <br />Locate bore holes in conjunction with Subsurface Utility Engineering services. Project Manager: Miguel <br />Soria, P.E. (305) 477-7575 <br /> <br />Sunny Isles Blvd (SR 826) from the Intercoastal waterway bridge to Collins A ve, Sunny Isles, Florida. <br />(2003). Mr. Carcamo was the crew chief in charge of all field operations including establishment of a <br />control network, Right of way location, Topo location & DTM. Project Manager: George Fischer, Grant <br />Coordinator (305) 947-0606 <br /> <br />Numerous sites throughout the City of Miami, Miami, Florida. (2004) As crew chief Mr. Carcamo was in- <br />charge of recovering / resetting City monuments, Right of way to Right of way locations (Topo & DTM). <br />Location of storm drainage structures to provide existing conditions information for development of a <br />storm water modeling GIS. Project Manager: Guido Van Meek, P.E. (305) 477-7575 <br /> <br />Grassy Key, Monroe County, Florida. (2004 - 2005). Mr. Carcamo was the crew chief in charge of field <br />operations for 2.5 miles of topographic survey that involved using GPS (RTK) for the location of <br />wetlands, proposed bike route, and cross sections along US #1. Project Manager: Richard Musgrove, <br />P. E. (850) 216-3270 <br /> <br />Schwebke - Shiskin & Associates, Inc. <br />June 1996 - May 2003 <br />Crew Chief <br /> <br />Miami-Dade County, Florida. Numerous hydrographic surveys, boundary surveys, and topographic <br />surveys done for Miami-Dade County. Project Manager: Pierre E. Calvet, P .S.M (305) 233-9210 <br /> <br />Homestead - Miami Speedway, Florida. (2001 - 2003). As crew chief Mr. Carcamo was in-charge of <br />providing horizontal and vertical control, topographic survey, as-built survey, construction layout, and <br />boundary surveys. Sample of jobs consist of installing new bleachers around the tract, rebuild racetrack <br />turns 1&2, layout additional parking. Project Manager: Pierre E. Calvet, P.S.M (305) 233-9210 <br />