|
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />I
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />I
<br />.
<br />j
<br />
<br />.
<br />.
<br />I
<br />.
<br />I
<br />.
<br />,
<br />,
<br />.
<br />.
<br />.
<br />.
<br />
<br />I
<br />.
<br />,
<br />.
<br />.
<br />I
<br />.
<br />.
<br />
<br />.
<br />.
<br />.
<br />.
<br />~
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />OMAR CARCAMO
<br />
<br />~~!!~,
<br />
<br />Crew Chief
<br />
<br />EDUCATION
<br />
<br />South Ridge Senior High School, Miami, FL (Diploma)
<br />Miami Dade Community College, Miami, FL (Associate in Arts in Electronics Engineering)
<br />Florida International University, Miami, FI. (Present)
<br />
<br />SUMMARY OF EXPERIENCE
<br />
<br />Mr. Carcamo has over 12 years experience in the Land Surveying industry. His experience includes
<br />horizontal and vertical control surveying, topographic, hydrographic, as-built survey, construction layout
<br />and boundary surveys. Mr. Carcamo has worked for a variety of city, and county agencies, as well as
<br />private clients.
<br />
<br />He is experienced with Sokia Radian IS & Topcon Hiper Pro (GPS) surveying equipment and with
<br />various total stations and levels out in the market today.
<br />
<br />SPECIFIC PROJECTS
<br />
<br />Marlin Engineering, Inc., Miami, Florida
<br />May 2003 - Present
<br />Crew Manager
<br />
<br />NW 25 St from NW 87 Ave to NW 67 Ave Miami, Florida. (2003 - 2004). As crew chief Mr. Carcamo
<br />was in-charge of recovering the control network, Right of way location, Topo location & DTM. Layout I
<br />Locate bore holes in conjunction with Subsurface Utility Engineering services. Project Manager: Miguel
<br />Soria, P.E. (305) 477-7575
<br />
<br />Sunny Isles Blvd (SR 826) from the Intercoastal waterway bridge to Collins A ve, Sunny Isles, Florida.
<br />(2003). Mr. Carcamo was the crew chief in charge of all field operations including establishment of a
<br />control network, Right of way location, Topo location & DTM. Project Manager: George Fischer, Grant
<br />Coordinator (305) 947-0606
<br />
<br />Numerous sites throughout the City of Miami, Miami, Florida. (2004) As crew chief Mr. Carcamo was in-
<br />charge of recovering / resetting City monuments, Right of way to Right of way locations (Topo & DTM).
<br />Location of storm drainage structures to provide existing conditions information for development of a
<br />storm water modeling GIS. Project Manager: Guido Van Meek, P.E. (305) 477-7575
<br />
<br />Grassy Key, Monroe County, Florida. (2004 - 2005). Mr. Carcamo was the crew chief in charge of field
<br />operations for 2.5 miles of topographic survey that involved using GPS (RTK) for the location of
<br />wetlands, proposed bike route, and cross sections along US #1. Project Manager: Richard Musgrove,
<br />P. E. (850) 216-3270
<br />
<br />Schwebke - Shiskin & Associates, Inc.
<br />June 1996 - May 2003
<br />Crew Chief
<br />
<br />Miami-Dade County, Florida. Numerous hydrographic surveys, boundary surveys, and topographic
<br />surveys done for Miami-Dade County. Project Manager: Pierre E. Calvet, P .S.M (305) 233-9210
<br />
<br />Homestead - Miami Speedway, Florida. (2001 - 2003). As crew chief Mr. Carcamo was in-charge of
<br />providing horizontal and vertical control, topographic survey, as-built survey, construction layout, and
<br />boundary surveys. Sample of jobs consist of installing new bleachers around the tract, rebuild racetrack
<br />turns 1&2, layout additional parking. Project Manager: Pierre E. Calvet, P.S.M (305) 233-9210
<br />
|