Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br /> <br />~ m[l@~~~~ ~l}{) <br />~ ~@@(Q@~m~ D~D <br /> <br />~ <br />.. . ... . .: ! <br /> <br />ammli~",lj1.0ji <br /> <br />EDUCA TlON: <br />B.S.C.E., Newark College of Engineering, 1973 <br /> <br />PROFESSIONAL LICENSES: <br />Registered Professional Engineer in Florida and New Jersey <br /> <br />PROFESSIONAL ORGANIZA TlONS: <br />American Society of Civil Engineers <br />American Segmental Bridge Institute <br />American Concrete Institute <br />PrecasUPrestressed Concrete Institute <br /> <br />CAREER EXPERIENCE: <br /> <br />Since 1973 Mr. Sanchez has served as a valuable member of the structural team, responsible for project management from <br />conceptual design development through final design plans and overall project guidance of major bridges and interchanges. <br />As the structural team leader, BHA has accomplished the designs of the interchanges and connections to the three major <br />international South Florida airports. His strengths and expertise are in concrete segmental, steel plate girders, steel boxes <br />and AASHTO beams bridge design. <br /> <br />Design and Structural Plans Review: <br /> <br />. NW. 25th Street Viaduct, Miami-Dade County (FOOT District 6) <br /> <br />Lead Reviewer for the 30 % Structural Concept and structural plans. The project is located on NW 25th Street between <br />the Miami International Airport (MIA) and 89th Avenue. <br /> <br />. S.R. 826/ S.R. 836 Interchange, Miami-Dade County (FOOT District 6) <br /> <br />Lead Reviewer of the Design and Structural Plans ( 30% and 60%Submittal) of six (6) Segmental Bridges and Temporary <br />Sheet Piling for the FOOT District 6. <br /> <br />. NW, 72nd Avenue Bridge, Miami-Dade County, Florida (Miami-Dade County Public Works) <br /> <br />Responsible for the review of the design and structural plans prepared by another company and updated to the latest <br />Code and Standards, on behalf of the Miami-Dade County Public Works. <br /> <br />. Sunrise Boulevard Over S.R. 7, FOOT District 4 <br /> <br />Responsible for the Peer Review of the plans and design of a three (3) spans continuous steel plate girders bridge, which <br />included an integral pier cap for the FOOT District 4. <br /> <br />. L.R. 795 Over Penrose Avenue, Philadelphia County, Pennsylvania <br /> <br />Responsible for the design review of a three (3)-cell concrete segmental box girder bridge in Pennsylvania. BHA <br />performed an independent detailed study through all construction stages and final structural system under the effects of <br />Deal Load and Post-Tensioning, Creep, Shrinkage and Steel Relaxation as well as (LL+ I) and temperature. <br /> <br />Selected project experience as Chief Structural Engineer and structural team leader includes: <br />