Laserfiche WebLink
<br />I <br /> <br />!. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br /> <br />, ~~~~~ [}{@g[}:j] <br />, <br />~ ~~[1i\~~ O~O <br /> <br />Manuel R. Sanchez, P.E <br />Page 2 <br /> <br />Williams Island VehicularlPedestrian Bridge, Miami.Dade County, Florida <br />This is a VehicularlPedestrian Bridge connecting the two main Islands. The structure consists of AASHTO Beams with a <br />cast-in-place deck and a canopy. Mr. Sanchez was the Project Engineer and designer of the substructure. <br /> <br />Pedestrian Bridge over 1.95 at NW 65 Street, Miami.Dade County, Florida <br />The structure is composed of two continuous single steel box girder spans over Interstate 1-95 and cast in place approach <br />spans. Mr. Sanchez was the designer of the steel box girder and he also participated in the design of the <br />substructure. <br /> <br />S.R. 934 (Hialeah Expressway) - Miami.Dade County, Florida .FDOT District VI (Steel Plate Girders) <br />Bridge Development Report (BDR), 30 % Bridge Plans and Final Plans <br /> <br />This project consisted of the widening of the simple supported steel plate girders bridges (slightly curved and on tangent <br />with six spans each @ 125') at S.R. 934 Over the FEC Railroad Crossing at W. 5th Way and the replacement of the existing <br />S.R. 934 Bridge Over the Miami Canal & S.R. 25 with simple and continuous steel plate girders straight spans. Mr. <br />Sanchez was in charge of the BDR and his final design activities were the following: <br /> <br />a. Retrofit design and checking of the existing Integral Steel Pier Caps at S.R. 934 Over the FEC Railroad Crossing at W. <br />5th Way. Vertical clearance constrains and the higher loads over the existing steel frame require strengthening of the <br />steel pier-cap and the foundation. The steel pier-cap is strengthened using external post-tensioning to increase the <br />positive moment capacity. Also he performed the Quality Control of the design for the new steel plate girders. <br />b. Quality Assurance Review of all the structural plans for the new structure at S.R. 934 Over the Miami Canal & S.R. 25. <br /> <br />S.R. 826 (Palmetto Expressway) Section 2 - FOOT District VI (Steel Box Girders and Plate girders Curved and <br />Straight) and Pedestrian Bridge Over S.R. 826 - Bridge Development Report (BDR), 30 % Bridge Plans and Final Plans <br /> <br />This project has six steel box girders and four steel plate girders bridges (4,312 linear feet of steel box girders and steel <br />plate girders with continuous and simply supported spans, maximum span of 262'-6", curved and on tangent) with four (4) <br />Integral Steel Pier Caps. This project is 100 % completed and ready to be submitted for final review. Mr. Sanchez was in <br />charge of the BDR and his final design activities were the following: <br /> <br />a. Design and Plans Supervision. <br />b. Supervised the use of the BSDI Program for the curved one lane steel box girders Bridge No.3 (Two Units: Unit NO.1 = <br />709' and Unit NO.2 = 790', maximum span 229'). The BSDI Program is a 3 dimensional, finite element program that <br />accounts for all major stresses including torsion and warping. <br />c. Performed Load Rating of several structures by the LRFR Method. This project was designed by the LFD Method but <br />the Department requested to perform the rating by the LRFR Method. <br />d. Quality Assurance Review of all the design & structural plans with the help of the Project Engineer. <br /> <br />Westbound Gandy Bridge, Pinellas/Hillsborough County, FL - FOOT District VII <br />(Segmental Bulb-Tee with Drop.ln-Beams longitudinally post-tensioned) <br /> <br />This high level fixed bridge over the ICWW in Tampa is 14,000 feet long. The navigable main unit consists of three <br />continuous spans 144'-234. 5'-144' of five segmental bulb-T girders with special haunched sections at the supports. The <br />approach spans consisted of two alternates, Florida bulb-T and AASHTO Types IV and VI beams, with the bulb-T option <br />selected based on low bid. The bridge is founded on drilled shafts designed to sustain ship impact forces of 2,400 kips. Mr. <br />Sanchez supervised the design of the navigable main unit superstructure including Quality Assurance Review of <br />the design and plans. Also, he performed a Quality Assurance Design Review of the substructure subjected to <br />ship impact. <br />