My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Soares Da Costa
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Responses
>
Soares Da Costa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 3:47:09 PM
Creation date
1/27/2011 3:47:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SR826/SIBlvd.
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Subtotal of 0200 Roadway $1,204,817.701 <br />II. Summary of 0300 Signing <br /> 38 Sign Single Post 41.00 AS $350.00 $14,350.00 <br /> 39 Sign Existing (Removal) 22.00 AS $45.00 $990.00 <br /> 40 Sign Existing (Relocate) 7.00 AS $225.00 $1,575.00 <br /> 41 Retro-Retlective Pavement Markers 192.00 EA $4.50 $864.00 <br /> 42 Painted Pavement Marking (Final Surface) 1.00 LS $10,500.00 $10,500.00 <br /> Subtotal of 0300 Signing $28,279.001 <br />III. Summary of 0400 Lighting <br /> 43 Light Pole Foundation 21.00 EA $850.00 $17,850.00 <br /> 44 Conduit (F & I Underground PVC SCH 80) 2" 3030.00 LF $28.00 $84,840.00 <br /> 45 Pull Box (F & I) at Light Pole 21.00 EA $950.00 $19,950.00 <br /> 46 Pull Box (F & 1) 2.00 EA $900.00 $1,800.00 <br /> 47 Conductors (F & I) (Insulated) (No.6) 10255.00 LF $10.00 $102,550.00 <br /> 48 Lighting Pole Complete (Single Arm Shoulder Mount) 21.00 EA $19,000.00 $399,000.00 <br /> 49 Pole Cable ~istribution System 21.00 EA $1,500.00 $31,500.00 <br /> 50 Service Rack Assembly 1.00 EA $18,000.00 $18,000.00 <br /> Subtotal of 0400 Lighting $675,490.001 <br />IV. Summary of 0500 Signalization <br /> 51 Conduit (Furnish & Install) (Under Pavement) 1705.00 LF $12.00 $20,460.00 <br /> 52 Cable (Signal) (Furnish & Install) 1.00 PI $3,500.00 $3,500.00 <br /> 53 Pull & Junction Boxes (F & I) (Pull Box) 20.00 EA $350.00 $7,000.00 <br /> 54 Electrical Power Service (Overhead) 1.00 AS $2,500.00 $2,500.00 <br /> 55 Electrical Service Wire 225.00 LF $650.00 $146,250.00 <br /> 56 M/Arm (F&I / HL) (SOL Arm W/O Lum) 1st Ann (B5) 1.00 EA $34,500.00 $34,500.00 <br /> 57 Signal Traffic (F&I) (3 Sect I Way) (Std) 3.00 AS $875.00 $2,625.00 <br /> 58 Signal Pedestrian (Neon International Sym Low Watt) 2.00 AS $1,750.00 $3,500.00 <br /> 59 Signal Head Auxiliaries (Back Plates 3 Sect) 3.00 EA $]25.00 $375.00 <br /> 60 Signal Head Auxiliaries (Aluminumm Pedestal) 1.00 EA $950.00 $950.00 <br /> 61 Loop Assembly (F&I) (Type A) 4.00 AS $1,200.00 $4,800.00 <br /> 62 Detector Pedest (F&I) (Oet Sts Pole or Cabinet Mtd) 2.00 EA $150.00 $300.00 <br /> 63 Cntl Assem Act SS (F&I) 170 Pre (none) 1.00 AS $21,500.00 $21,500.00 <br /> 64 System Auxiliares (Telemetry Transceiver) 1.00 EA $4,500.00 $4,500.00 <br /> 65 System Auxiliares (Universal Adapter) 1.00 EA $350.00 $350.00 <br /> 66 System Auxiliares (Standby System Relay) 1.00 EA $650.00 $650.00 <br /> 67 Signal I-lead Traffic Assembly Removal 3.00 EA $65.00 $195.00 <br /> March 2007 00300-3 03-4122.0. <br /> Addendum #4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.