Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01025 <br />MEASUREMENT AND PAYMENT <br /> <br />PART 1 - GENERAL <br /> <br />1.01 RELATED REQUIREMENTS <br /> <br />A. General provisions of Contract, including General and Supplementary <br />Conditions. <br /> <br />B. Other Division-1 Specification Sections. <br /> <br />1.02 SECTION INCLUDES <br /> <br />A. Administrative and procedural requirements for determining Work completed <br />under unit price contract. <br /> <br />1.03 GENERAL REQUIREMENTS <br /> <br />A. Lump Sum and unit prices shall include the providing of all costs required for the <br />complete demolition as noted, construction of the specified unit of work including <br />cost of materials and delivery; cost of installation labor, including social security, <br />insurance, and other required fringe benefits, workman's compensation <br />insurance; bond premiums; rental of equipment and machinery; taxes; testing; <br />surveys and other incidental expenses; and supervision. <br /> <br />B. The Owner reserves the right to reject the Contractor's measurement of <br />completed work that involves use of established unit prices, and to have this <br />Work measured by an independent surveyor acceptable to the Contractor at the <br />Owner's expense. <br /> <br />C. Contract Sum adjustments will be by Change Order on basis of net accumulative <br />change for each unit price category. <br /> <br />1. Except as otherwise specified, unit prices shall apply to both deductive <br />and additive variations of quantities. <br />2. Lump sum and unit prices in the Agreement shall remain in effect until <br />date of final completion of the entire Work. <br /> <br />D. Partial payment for material and equipment properly stored and protected will be <br />made in accordance with requirements of the General Conditions. <br /> <br />E. Payment will be made at the respective contract unit and lump sum price for <br />each item shown in the Agreement, installed and accepted, which price and <br />payment shall constitute full compensation for furnishing all materials and <br />performing all Work in connection therewith and incidental thereto. No separate <br />payment will be made for testing. <br /> <br />06/07 <br /> <br />01025-1 <br /> <br />03-4197 <br />