Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />F. Unit Price Abbreviations: <br /> <br />1. Lineal Feet - LF <br />2. Acre - AC <br />3. Cubic Yard - CY <br />4. Square Yard - SY <br />5. Each - EA <br />6. Lump Sum - LS <br />7. Ton - TN <br />8. Net Mile - NM <br />9. Gross Mile - GM <br />10. Gallons - GA <br />11. Million Gallons - MG <br /> <br />PART 2 - PRODUCTS (Not applicable) <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 MEASUREMENT AND PAYMENT <br /> <br />A. Furnish and Install Drainage Pipe <br /> <br />1. Measurement for payment for furnishing and installing drainage pipe will be <br />based upon the actual number of linear feet of such pipe constructed as <br />determined by measurement along the centerline of the pipe in place, not <br />including through structures, all in accordance with the requirements of the <br />Contract Documents. <br /> <br />2. Payment for furnishing and installing drainage pipe will be made at the unit <br />price per linear foot of pipe named in the Bid Schedule. <br /> <br />3. Payment shall include providing all necessary pipe, trench excavation, <br />bedding, backfilling, compaction, and the appurtenant items for which <br />separate payment is not specifically included in the Bid Schedule. <br /> <br />B. Furnish and Install Catch Basin, Storm Maintenance Access Structure or Conflict <br />Structure <br /> <br />1. Measurement for payment for furnishing and installing catch basins or storm <br />maintenance access structures will be based upon the actual quantity, each, <br />of such structures constructed, all in accordance with the requirements of the <br />Contract Documents. <br /> <br />2. Payment for furnishing and installing catch basins or storm maintenance <br />access structures will be made at the unit price, each, named in the Bid <br />Schedule, which price shall constitute full compensation for the completed <br />installation of the structure including but not limited to excavation, dewatering, <br />backfill and compaction, construction of the reinforced concrete structure and <br />plugged openings (bricks and expanding grout or as approved by the <br />ENGINEER) for proposed future connections, as well as furnishing and <br />installing debris baffles/inverted debris baffles and concrete drainage aprons <br /> <br />06/07 <br /> <br />01025-2 <br /> <br />03-4197 <br />