Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />06/07 <br /> <br />---------- - l <br />- ------ <br /> <br />where applicable, and the appurtenant items for which separate payment is <br />not specifically included in the Bid Schedule. <br /> <br />3. Conflict structures will include pipe sleeve, if required. <br /> <br />C. <br /> <br />Connect to Existing Drainage Pipe <br /> <br />1. Measurement for payment for connecting to drainage pipes will be based <br />upon the actual quantity, each, of such connections, all in accordance with <br />the requirement of the Contract Documents. <br /> <br />2. Payment for connecting to existing drainage pipes will be made at the unit <br />price, each, named in the Bid Schedule, which pri ce shall constitute full <br />compensation for the completed installation of the connection including but <br />not limited to excavation, dewatering, backfill and compaction, removing <br />existing knockout plug where applicable, saw cutting, grouting, construction <br />of the connection, restoration, all else necessary for a complete and <br />functional installation, and the appurtenant items for which separate payment <br />is not specifically included in the Bid Schedule. <br /> <br />D. <br /> <br />Remove and Dispose of Existing Drainage Pipe <br /> <br />1. Measurement for payment to remove and dispose of existing drainage pipe <br />will be based upon the actual number of linear feet of such pipe actually <br />removed all in accordance with the Contract Documents. <br /> <br />2. Payment for removal and disposal of existing drainage pipe will be made at <br />the unit price per linear foot of pipe named in the Bid Schedule, which price <br />shall constitute full compensation for the removal and disposal of such <br />drainage pipe including backfilling and all restoration work. <br /> <br />E. <br /> <br />Remove and Dispose of Existing Drainage Structure <br /> <br />1. Measurement for payment to remove and dispose of existing drainage <br />structures will be based upon the actual number, each, of such structures <br />actually removed all in accordance with the Contract Documents. <br /> <br />2. Payment for removal and disposal of existing drain age structures will be <br />made at the unit price, each, named in the Bid Schedule, which price shall <br />constitute full compensation for the removal and disposal of each catch basin <br />or storm maintenance structure, including backfilling and all restoration work. <br /> <br />F. <br /> <br />Furnish and Install Asphalt Concrete Pavement <br /> <br />1. Measurement for payment of asphalt concrete pavement will be based upon <br />the number of square yards of such asphalt concrete pavement actually <br />constructed, as detailed in the Drawings, all in accordance with the Contract <br />Documents. <br /> <br />2. Payment for placement of asphalt concrete pavement and the thickness <br />indicated will be made at the unit price per square yard for such placement as <br /> <br />01025-3 <br /> <br />03-4197 <br />