Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />06/07 <br /> <br />v. <br /> <br />w. <br /> <br />x. <br /> <br />T. <br /> <br />Remove and Dispose Existing Street Sign <br /> <br />1. Measurement for payment to remove and dispose existing signs will be <br />based upon the actual quantity, each, of such signs actually removed from <br />the right-of-way, all in accordance with the Contract Documents. <br /> <br />2. Payment for removal and disposal of existing signs will be made at the unit <br />price, each, named in the Bid Schedule, which price shall constitute full <br />compensation for the removal and disposal of existing signs. <br /> <br />U. <br /> <br />Furnish and Install Street Signs (With Post) <br /> <br />1. Measurement for payment to furnish and install signs will be based upon the <br />actual quantity, each, of such signs furnished and installed, all in accordance <br />with the Contract Documents. <br /> <br />2. Payment for furnishing and installing signs will be made at the unit price, <br />each, named in the Bid Schedule, which price shall constitute full <br />compensation for the completed installation of the sign including post, and all <br />else necessary for a complete and functional installation. <br /> <br />Furnish and Install Text or Directional Arrow <br /> <br />1. Measurement for payment to furnish and install text or directional arrows will <br />be based upon the actual quantity, each, of such text or directional arrows <br />furnished and installed, all in accordance with the Contract Documents. <br /> <br />2. Payment for furnishing and installing text or directional arrows will be made at <br />the unit price, each, text or arrow with associated lines, named in the Bid <br />Schedule, which price shall constitute full compensation for the work of the <br />complete installation. <br /> <br />Relocate Existing Utility Poles <br /> <br />1. Measurement for payment for relocation of existing utility poles will be based <br />upon the actual number of utility poles relocated, all in accordance with the <br />Contract Documents. <br /> <br />2. Payment for relocating existing utility poles will be made at the unit price <br />name in the Bid Schedule, which price shall constitute full compensation for <br />the complete relocation of the utility poles. Utility poles shall be relocated in <br />accordance with local or governing power company regulations. <br /> <br />3. No separate payment shall be made for temporary relocation of existing utility <br />poles required during construction. <br /> <br />Project Mobilization <br /> <br />1. The project mobilization item shall be administered in accordance with the <br />Florida Department of Transportation, Standard Specifications for Road & <br />Bridge Construction (latest edition); MOBILIZATION. <br /> <br />01025-8 <br /> <br />03-4197 <br />