My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.02 <br /> <br />3.03 <br /> <br />06/07 <br /> <br />2. The maximum amount allowed for the mobilization item shall be ten percent <br />(10%) of the total contract amount. <br /> <br />3. Mobilization includes, but is not limited to, mobilization of equipment, all <br />surveying, all supervision, cost of all bonds and warranties, all permit fees, <br />and all insurance. <br /> <br />PROTECTION <br /> <br />A. Where pavement, trees, shrubbery, fences or other property or surface structures <br />have been damaged, removed or disturbed by the Contractor, whether <br />deliberately or through failure to carry out the requirements of the Contract <br />Documents, state laws, municipal ordinances or the specific direction of the <br />Engineer, or through failure to employ usual and reasonable safeguards, such <br />property and surface structures shall be replaced or repaired at the expense of <br />the Contractor to a condition equal to that before work began within a time frame <br />approved by the Engineer. <br /> <br />SUBMITTALS <br /> <br />A. On lump sum items, a complete schedule of values must be submitted at the pre- <br />construction meeting by the contractor. <br /> <br />END OF SECTION <br /> <br />01025-9 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.