My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01030 <br />SPECIAL PROJECT PROCEDURES <br /> <br />PART 1 - GENERAL <br /> <br />1.01 OBSTRUCTIONS <br /> <br />A. The attention of the Contractor is drawn to the fact that during construction at the <br />Project site, the possibility exists of the Contractor encountering various water, <br />sewer, petroleum, gas, telephone, electrical, or other lines not shown on the <br />Drawings. The Contractor shall exercise extreme care before and during <br />construction to locate and flag these lines so as to avoid damage to the existing <br />lines. Should damage occur to an existing line, the Contractor shall repair the line <br />at no cost to the Owner. <br /> <br />1.02 PROVISIONS FOR THE CONTROL OF DUST <br /> <br />A. Sufficient precautions shall be taken during construction to minimize the amount of <br />dust created. Wetting down the site may be required or as directed by the <br />Engineer to prevent dust as a result of vehicular traffic. <br /> <br />1.03 RELOCATIONS <br /> <br />A. The Contractor shall be responsible for the relocation of structures, including but <br />not limited to light poles, signs, sign poles, fences, piping, conduits and drains that <br />interfere with the positioning of the work as set out on the Drawings. The cost of <br />all such relocations shall be included in the bid for the project and shall not result in <br />any additional cost to the Owner. <br /> <br />1.04 WARRANTIES <br /> <br />A. All equipment supplied under these Specifications shall be warranted by the <br />Contractor and the equipment manufacturers for a period of one (1) year. <br />Warranty period shall commence on the date of Owner acceptance. <br /> <br />B. The equipment shall be warranted to be free from defects in workmanship, design <br />and materials. If any part of the equipment should fail during the warranty period, it <br />shall be replaced in the machine(s) and the unit(s) restored to service at no <br />expense to the Owner. <br /> <br />C. The manufacturer's warranty period shall run concurrently with the Contractor's <br />warranty or guarantee period. No exception to this provision shall be allowed. <br /> <br />D. In the event that the manufacturer is unwilling to provide a one year warranty <br />commencing at the time of Owner acceptance, the Contractor shall obtain from the <br />manufacturer a two (2) year warranty starting at the time of Owner acceptance of <br />the equipment. <br /> <br />06/07 <br /> <br />01030-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.