Laserfiche WebLink
<br />I <br /> <br />II <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.05 HURRICANE PREPAREDNESS PLAN <br /> <br />A. Within ten days of the date of Notice to Proceed, the Contractor shall submit to the <br />Engineer and Owner a Hurricane Preparedness Plan. The plan should outline the <br />necessary measures, which the Contractor proposes to perform at no additional <br />cost to the Owner in case of a hurricane warning. <br /> <br />B. In the event of inclement weather or whenever the Engineer shall direct; the <br />Contractor will cause Subcontractors to protect carefully the Work and materials <br />against damage or injury from the weather. If, in the opinion of the Engineer, any <br />portion of Work or materials shall have been damaged or injured by reason of <br />failure on the part of Contractor or any Subcontractor to so protect the Work, such <br />Work and materials shall be removed and replaced at the expense of the <br />Contractor. <br /> <br />1.06 EQUIPMENT, TESTING & INSPECTION <br /> <br />A. Regardless of the number of days specified in the individual sections for the <br />manufacturers representative to be present on the site for inspection and testing, if <br />the equipment fails to perform as specified then the representative shall remain on <br />site until the malfunction is corrected and the Owner received specified days of <br />inspection or testing. <br /> <br />B. The cost for the additional days required shall not be added to the cost of the <br />Owner, but shall be to the account of the Contractor. <br /> <br />PART 2 - PRODUCTS (Not Used) <br /> <br />PART 3 - EXECUTION (Not Used) <br /> <br />END OF SECTION <br /> <br />06/07 <br /> <br />01030-2 <br /> <br />03-4197 <br />