My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01045 <br />CUTTING AND PATCHING <br /> <br />PART 1 - GENERAL <br /> <br />1.01 WORK INCLUDED <br /> <br />A. Contractor shall be responsible for all cutting, fitting and patching, including <br />attendant excavation and backfill, required to complete the work or to: <br /> <br />1. Make its several parts fit together properly. <br />2. Uncover portions of the Work to provide for installation of ill-timed work. <br />3. Remove and replace defective work. <br />4. Remove and replace work not conforming to requirements of Contract <br />Documents. <br />5. Remove samples of installed work as specified for testing. <br />6. Provide routine penetrations of non-structural surfaces for installation of <br />piles, piping, and electrical conduit. <br />7. Investigate subsurface conditions or utilities. <br /> <br />1.02 RELATED WORK <br /> <br />A. Section 01010: Summary of Work <br /> <br />1.03 SUBMITTALS <br /> <br />A. Submit a written request to the Engineer well in advance of executing any cutting <br />or alteration that affects: <br /> <br />1. Work of the Owner or any separate contractor. <br />2. Structural value or integrity of any element of the Project. <br />3. Integrity or effectiveness of weather-exposed or moisture-resistant <br />elements or systems. <br />4. Efficiency, operational life, maintenance or safety of operational elements. <br />Visual qualities of sight-exposed elements. <br /> <br />B. Request shall include: <br /> <br />1. Identification of the Project. <br />2. Description of affected work. <br />3. The necessity for cutting, alteration or excavation. <br />4. Effect on work of Owner or any separate contractor, or on structural or <br />weatherproof integrity of Project. <br />5. Description of proposed work: <br />a. Scope of cutting, patching, alteration, or excavation. <br />b. Trades who will execute the work. <br />c. Products proposed to be used. <br />d. Extent of refinishing to be redone. <br />6. Alternatives to cutting and patching. <br />7. Cost proposal, when applicable. <br /> <br />06/07 <br /> <br />01045-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.