My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />8. <br />affected. <br /> <br />Written permission of any separate contractor whose work will be <br /> <br />C. Submit written notice to the Engineer designating the date and the time work will <br />be uncovered. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 MATERIALS <br /> <br />A. Comply with specifications and standards for each specific project involved. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 INSPECTION <br /> <br />A. Inspect existing conditions of Project, including elements subject to damage or to <br />movement during cutting or patching. <br /> <br />B. After uncovering work, inspect conditions affecting installation of Products, or <br />performance of work. <br /> <br />C. Report unsatisfactory or questionable conditions to the Engineer in writing; do not <br />proceed with work until the Engineer has provided further instructions. <br /> <br />3.02 PREPARATION <br /> <br />A. Provide adequate temporary support as necessary to assure structural value or <br />integrity of affected portion of Work. <br /> <br />B. Provide devices and methods to protect other portions of Project from damage. <br /> <br />C. Provide protection from elements for that portion of the project that may be <br />exposed by cutting and patching work, and maintain excavations free from water. <br /> <br />3.03 PERFORMANCE <br /> <br />A. Execute cutting and demolition by methods that will prevent damage to other <br />work, and will provide proper surfaces to receive installation of repairs. <br /> <br />B. Execute excavating and backfilling by methods that will prevent settlement or <br />damage to other work. <br /> <br />C. Employ original Installer or Fabricator to perform cutting and patching for: <br />1. Weather-exposed or moisture-resistant surfaces. <br />2. Sight-exposed finished surfaces. <br /> <br />D. Execute fitting and adjustment of products to provide a finished installation to <br />comply with specified products, functions, tolerances and finishes. <br /> <br />06/07 <br /> <br />01045-2 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.