Laserfiche WebLink
<br />I <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />I II <br />II <br />II <br />II <br />II <br />il <br />11 <br />11 <br />II <br />II <br />II <br /> <br />SECTION 01100 <br /> <br />ALTERNATES <br /> <br />PART 1 - GENERAL <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. This section identifies procedures for proposing Alternates, and describes the <br />basic changes to be incorporated into the Work, only when that Alternate is made <br />a part of the Work by specific provisions in the Owner-Contractor Agreement. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Bidding Documents: Method of quotation of the cost of each Alternate, and the <br />basis of the Owner's acceptance of Alternates. <br /> <br />B. Owner-Contractor Agreement: Incorporation of Alternates into the Work. <br /> <br />C. Sections of the Specifications as listed under the respective Alternates. <br /> <br />D. Referenced sections of Specifications stipulate pertinent requirements for products <br />and methods to achieve the work stipulated under each Alternate. <br /> <br />E. Coordinate pertinent related work and modify surrounding work as required to <br />properly integrate the work under each Alternate, and to provide the complete <br />construction required by Contract Documents. <br /> <br />1.03 PROCEDURES <br /> <br />A. Alternates will be exercised at the option of the Owner. <br /> <br />B. Coordinate related work and modify surrounding work as required to complete the <br />Work, including changes under each Alternate, and to provide the complete <br />construction required by Contract Documents. <br /> <br />C. The Bidders may offer optional proposals in the part of the Bid form titled <br />"Document 00400, Appendix C" for manufacturers and suppliers of equipment <br />other than those required to be used in the base bid which they believe meets the <br />Specifications for the Owner's consideration. After the Contract has been <br />awarded, the Owner will determine whether any or all of the equipment options will <br />be accepted and a Change Order will be issued to revise the contract price in the <br />amount of the options desired. Offering an option shall bind the Contractor to <br />accepting the Change Order, but the Owner is in no way bound to accept any <br />option. If any option is offered, the model number and brand name must be <br />submitted. <br /> <br />06/07 <br /> <br />01100-1 <br /> <br />03-4197 <br />