Laserfiche WebLink
<br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />il <br />II <br />II <br />II <br />II <br />il <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />D. If an equipment option is proposed, the option price must reflect any additional <br />installation and engineering costs required as a result of differences in equipment <br />installation requirements. No extra cost will be paid to the Contractor for <br />modification of concrete piping, electrical, etc., in the event the Owner elects to <br />accept an option. All revisions required shall be subject to the approval of the <br />Engineer. <br /> <br />PART 2 - PRODUCTS (Not Used) <br /> <br />PART 3 - EXECUTION (Not Used) <br /> <br />END OF SECTION <br /> <br />06/07 <br /> <br />01100-2 <br /> <br />03-4197 <br />