My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 01200 <br />PROJECT MEETINGS <br /> <br />PART 1 - GENERAL <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />A. The Engineer shall schedule and administer pre-construction meetings, periodic <br />progress meetings, and specially called meetings throughout the progress of <br />work. The Engineer shall: <br /> <br />1. Prepare agenda for meetings. <br /> <br />2. Make physical arrangements for meetings. <br /> <br />3. Preside at meetings. <br /> <br />4. Record the minutes; include significant proceedings and decisions. <br /> <br />5. Reproduce and distribute copies of minutes within five working days after <br />each meeting. <br />a. To participants in the meeting. <br />b. To parties affected by decisions made at the meeting. <br /> <br />B. <br /> <br />Representatives of contractors, subcontractors and suppliers attending meetings <br />shall be qualified and authorized to act on behalf of the entity each represents. <br /> <br />C. <br /> <br />The Contractor shall attend meetings to ascertain that work is executed <br />consistent with Contract Documents and construction schedules. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />I <br /> <br />I <br /> <br />A. <br />B. <br />C. <br /> <br />Section 01310: <br />Section 01340: <br />Section 01720: <br /> <br />Construction Schedules. <br />Shop Drawings, Working Drawings, and Samples. <br />Project Record Documents. <br /> <br />1.03 PRE-CONSTRUCTION MEETING <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />06/07 <br /> <br />I <br /> <br />1. <br /> <br />Schedule a pre-construction meeting no later than 15 days after date of Notice to <br />Proceed. <br /> <br />2. <br /> <br />Location: <br /> <br />A central site, convenient for all parties designated by the Owner. <br /> <br />3. <br /> <br />Attendance: <br /> <br />a. <br />b. <br />c. <br />d. <br />e. <br /> <br />Owner's Representative. <br />Engineer and his Professional Consultants. <br />Resident Project Representative. <br />Contractor's Superintendent. <br />Major Subcontractors. <br /> <br />01200-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.