My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3. Suppliers as appropriate to the agenda. <br /> <br />4. Others as appropriate. <br /> <br />E. Suggested Agenda: <br /> <br />1. Review, approval of minutes of previous meeting. <br /> <br />2. Review of work progress since previous meeting. <br /> <br />3. Field observations, problems, conflicts. <br /> <br />4. Problems which impede Construction Schedule. <br /> <br />5. Review of off site fabrication, delivery schedule. <br /> <br />6. Corrective measures and procedures to regain projected schedule. <br /> <br />7. Revisions to Construction Schedule. <br /> <br />8. Progress, schedule, during succeeding work period. <br /> <br />9. Coordination of schedules. <br /> <br />10. Review submittal schedules; expedite as required. <br /> <br />11. Maintenance of quality standards. <br /> <br />12. Pending changes and substitutions. <br /> <br />13. Review proposed changes for: <br />a. Effect on Construction Schedule and on a completion date. <br />b. Effect on other contracts of the Project. <br /> <br />14. Other business. <br /> <br />15. Construction schedule. <br /> <br />16. Critical/long lead items. <br /> <br />F. The Contractor is to attend progress meetings and is to study previous meeting <br />minutes and current agenda items, in order to be prepared to discuss pertinent <br />topics such as deliveries of materials and equipment, progress of work, etc. <br /> <br />G. The Contractor is to provide a current submittal log at each progress meeting in <br />accordance with Section 01340. <br /> <br />PART 2 - PRODUCTS <br />PART 3 - EXECUTION <br /> <br />(Not Used) <br />(Not Used) <br />END OF DOCUMENT <br /> <br />06/07 <br /> <br />01200-3 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.