My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.05 <br /> <br />1.06 <br /> <br />06/07 <br /> <br />B. Submittals Schedule for Shop Drawings, and Samples In accordance with <br />Section 01340. Show: <br /> <br />1. The dates for Contractor's submittals. <br /> <br />2. The dates submittals will be required for owner furnished products, if <br />applicable. <br /> <br />3. The dates approved submittals will be required from the Engineer. <br /> <br />C. A list of all long lead items (equipment, materials, etc). <br /> <br />PROGRESS REVISIONS <br /> <br />A. Indicate progress of each activity to date of submission. <br /> <br />B. Show changes occurring since previous submission of schedule: <br /> <br />1. Major changes in scope. <br /> <br />2. Activities modified since previous submission. <br /> <br />3. Revised projections of progress and completion. <br /> <br />4. Other identifiable changes. <br /> <br />C. Provide a narrative report as needed to define: <br /> <br />1. Problem areas, anticipated delays, and the impact on the schedule. <br /> <br />2. Corrective action recommended, and its effect. <br />The effect of changes on schedules of other prime contractors. <br /> <br />SUBMISSIONS <br /> <br />A. Submit initial schedules to the Engineer within 10 days after the effective date of <br />the Agreement. <br /> <br />1. The Engineer will review schedules and return review copy within 21 days <br />after receipt. <br /> <br />2. If required, resubmit within 7 days after return of review copy. <br /> <br />B. Submit 5 copies of revised monthly progress schedules with that month's <br />application for payment. <br /> <br />01310-3 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.