Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.04 <br /> <br />06/07 <br /> <br />B. Format of listings: The chronological order of the start of each item of work for <br />each structure. <br /> <br />C. Identification of listings: By major specification section numbers as applicable <br />and structure. <br /> <br />CONTENT OF SCHEDULES <br /> <br />A. Construction Progress Schedule: <br /> <br />1. Show the complete sequence of construction by activity. <br /> <br />2. Show the dates for the beginning of, and com pletion of, each major <br />element of construction in no more than a two-week increment scale. <br />Specifically list, but not limited to: <br /> <br />a. Receiving Materials <br />b. Pipeline Installations <br />c. Testing <br />d. Restoration <br />e. Startup <br />f. Record Drawings <br />g. Permits <br />h. Punch List <br />i. Owner Activities, Including Inspections <br /> <br />3. Show projected percentage of completion for each item, as of the first of <br />each month. <br /> <br />4. Show projected dollar cash flow requirements for each month of <br />construction. <br /> <br />5. Use of float suppression techniques such as preferential sequencing or <br />logic, special lead/lag logic restraints, and extended activity times are <br />prohibited, and use of float time disclosed or implied by use of alternate <br />float-suppression techniques shall be shared to proportionate benefit of <br />the Owner and Contractor. <br /> <br />6. Pursuant to above float-sharing requirement, no time extensions will be <br />granted nor delay damages paid until a delay occurs which (i) impacts <br />Project's critical path, (ii) consumes available float or contingency time, <br />and (iii) extends work beyond contract completion date. <br /> <br />7. If the Contractor provides an accepted schedule with an early completion <br />date, the Owner reserves the right to reduce the duration of the work to <br />match the early completion date by issuing a deductive Change Order at <br />no change in Contract Price. <br /> <br />01310-2 <br /> <br />03-4197 <br />