Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.05 <br /> <br />06/07 <br /> <br />I. No partial submittals will be reviewed. Submittals not complete will be returned to <br />the Contractor, and will not be considered "Rejected" until resubmitted. <br /> <br />SHOP DRAWINGS <br /> <br />A. When used in the Contract Documents, the term "Shop Drawings" shall be <br />considered to mean Contractor's plans for material and equipment that become <br />an integral part of the Project. These drawings shall be complete and detailed. <br />Shop Drawings shall consist of fabrication, erection and setting drawings and <br />schedule drawings, manufacturer's scale drawings, and wiring and control <br />diagrams. Cuts, catalogs, pamphlets, descriptive literature, and performance and <br />test data, shall be considered only as supportive to required Shop Drawings as <br />defined above. <br /> <br />B. Drawings and schedules shall be checked and coordinated with work of all trades <br />involved, before they are submitted for review by the Engineer and shall bear the <br />Contractor's stamp of approval as evidence of such checking and coordination. <br />Drawings or schedules submitted without this stamp of approval shall be returned <br />to the Contractor for resubmission. <br /> <br />C. Each Shop Drawing, shall have a blank area 3 1/2 inches by 3 1/2 inches, located <br />adjacent to the title block. The title block shall display the following: <br /> <br />1. Number and title of the drawing. <br />2. Date of drawing or revision. <br />3. Name of project building or facility. <br />4. Name of contractor and subcontractor submitting drawing. <br />5. Clear identification of contents and location of work. <br />6. Specification title and number. <br /> <br />D. If drawings show variations from Contract requirements because of standard <br />shop practice or for other reasons, the Contractor shall describe such variations <br />in his letter of transmittal. If acceptable, proper adjustment in the Contract shall <br />be implemented where appropriate. If the Contractor fails to describe such <br />variations he shall not be relieved of the responsibility for executing the work in <br />accordance with the Contract, even though such drawings have been reviewed. <br /> <br />E. Data on materials and equipment include, without limitation, materials and <br />equipment lists, catalog data sheets, cuts, performance curves, diagrams, <br />materials of construction and similar descriptive material. Materials and <br />equipment lists shall give, for each item thereon, the name and location of the <br />supplier or manufacturer, trade name, catalog reference, size, finish and all other <br />pertinent data. <br /> <br />F. For all mechanical and electrical equipment furnished, the Contractor shall <br />provide a list including the equipment name, address and telephone number of <br />the manufacturer's representative and service company so that service and spare <br />parts can be readily obtained. In addition, a maintenance and lubrication <br />schedule for each piece of equipment shall be submitted along with each shop <br />drawing submittal. <br /> <br />01340-4 <br /> <br />03-4197 <br />