My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />m <br />I <br />D <br />o <br />D <br />I <br />I <br />I <br /> <br />2. Full range of color, texture and pattern. <br /> <br />3. A minimum of two samples of each item shall be submitted. <br /> <br />C. Each sample shall have a label indicating <br /> <br />1. Name of Project <br /> <br />2. Name of Contractor and Subcontractor <br /> <br />3. Material or Equipment Represented <br /> <br />4. Place of Origin <br /> <br />5. Name of Producer and Brand (if any) <br /> <br />6. Location in Project <br /> <br />(Samples of finished materials shall have additional marking that will identify them <br />under the finished schedules.) <br /> <br />D. The Contractor shall prepare a transmittal letter in triplicate for each shipment of <br />samples containing the information required in subparag raph 1.07B above. He <br />shall enclose a copy of this letter with the shipment and send a copy of this letter <br />to the Engineer. Approval of a sample shall be only for the characteristics or use <br />named in such approval and shall not be construed to change or modify any <br />Contract requirements. <br /> <br />E. Approved samples not destroyed in testing shall be sent to the Engineer or stored <br />at the site of the work. Approved samples of the hardware in good condition will <br />be marked for identification and may be used in the work. Materials and <br />equipment incorporated in work shall match the approved samples. Samples <br />which failed testing or were not approved samples will be returned to the <br />Contractor at his expense, if so requested at time of submission. <br /> <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br /> <br />END OF SECTION <br /> <br />06/07 <br /> <br />01340-6 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.