Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />m <br />I <br />,I <br />m <br />I <br />I <br />I <br />I <br />I <br />o <br />I <br />I <br />o <br /> <br />DOCUMENT 01370 <br />SCHEDULE OF VALUES <br /> <br />PART 1 - GENERAL <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. Submit to the Engineer a Schedule of Values allocated to the various portions of <br />the Work, within 10 days after the effective date of the Agreement. <br /> <br />B. Upon request of the Engineer, support the values with data that will substantiate <br />their correctness. <br /> <br />C. The Schedule of Values shall be used as the basis for the Contractor's <br />Applications for Payment. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Section 01152: Application for Payment <br /> <br />1.03 FORM AND CONTENT OF SCHEDULE OF VALUES <br /> <br />A. Type schedule on an 8-1/2 inch x 11 inch or 8-1/2 inch x 14 inch white paper; <br />Contractor's standard forms and automated printout will be considered for approval <br />by the Engineer upon Contractor's request. Identify schedule with: <br /> <br />1. Title of Project and location <br /> <br />2. Engineer and Project number <br /> <br />3. Name and Address of Contractor <br /> <br />4. Contract designation <br /> <br />5. Date of submission <br /> <br />B. Schedule shall list the installed value of the component parts to include individual <br />equipment, piping, electrical, paving, of the Work (as required) in sufficient detail to <br />serve as a basis for computing values for progress payments during construction. <br /> <br />C. For the various portions of the Work: <br /> <br />1. Each item shall include a directly proportional amount of the Contractor's <br />overhead and profit. <br /> <br />D. The sum of all values listed in the schedule shall equal the total Contract Sum. <br /> <br />06/07 <br /> <br />01370-1 <br /> <br />03-4197 <br />