My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o <br />U <br />I <br />m <br />I <br />m <br />- <br />I <br />- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.04 <br /> <br />1.05 <br /> <br />06/07 <br /> <br />to identify the particular product and to form an opinion as to its conformity to the <br />specifications. The data shall comply with Paragraph 1.07 of this Section. <br /> <br />C. Facilities and labor for handling and inspection of all materials and equipment <br />shall be furnished by the Contractor. If the Engineer requires, either prior to <br />beginning or during progress of the work, the Contractor shall submit samples of <br />materials for such special tests as may be necessary to demonstrate that they <br />conform to the specifications. Such samples shall be furnished, stored, packed, <br />and shipped as directed at the Contractor's expense. <br /> <br />D. The Contractor shall submit data and samples sufficiently early to permit <br />consideration and approval before materials are necessary for incorporation in <br />the work. Any delay of approval resulting from the Contractor's failure to submit <br />samples or data promptly shall not be used as a basis of claim against the Owner <br />or the Engineer. <br /> <br />E. In order to demonstrate the proficiency of workmen or to facilitate the choice <br />among several textures, types, finishes, and surfaces, the Contractor shall <br />provide such samples of workmanship or finish as may be required. <br /> <br />F. The materials and equipment used on the work shall correspond to the approved <br />samples or other data. <br /> <br />MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br /> <br />A. When Contract Documents require that installation of work shall comply with <br />manufacturer's printed instruction, obtain and distribute copies of such <br />instructions to parties involved in the installation, including copies to the Engineer. <br /> <br />1. Maintain one set of complete instructions at the job site during installation <br />and until completion. <br /> <br />B. Handle, install, connect, clean, condition and adjust products in strict accord with <br />such instructions and in conformity with specified requirements. <br /> <br />1. Should job conditions or specified requirements conflict with <br />manufacturer's instructions, consult with Engineer for further instructions. <br /> <br />2. Do not proceed with work without clear instructions. <br /> <br />C. Perform work in accord with manufacturer's instructions. Do not omit any <br />preparatory step or installation procedure unless specifically modified or <br />exempted by Contract Documents. <br /> <br />TRANSPORTATION AND HANDLING <br /> <br />A. Arrange deliveries of Products in accord with construction schedules, coordinate <br />to avoid conflict with work and conditions at the site. <br /> <br />1. Deliver Products in undamaged condition, in manufacturer's original <br />containers or packaging, with identifying labels intact and legible. <br /> <br />01600-2 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.